• Shopping Cart
    There are no items in your cart

BS EN 60335-2-69:2009

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

Household and similar electrical appliances. Safety Particular requirements for wet and dry vacuum cleaners, including power brush, for commercial use

Available format(s)

Hardcopy , PDF

Superseded date

31-05-2013

Superseded by

BS EN 60335-2-69:2012

Language(s)

English

Published date

31-12-2009

Committee
CPL/61/10
DocumentType
Standard
Pages
64
PublisherName
British Standards Institution
Status
Superseded
SupersededBy
Supersedes

IEC 61400-21-2 - Wind energy generation systems - Measurement and assessment of electrical characteristics - Wind power plants - has the following scope: IEC 61400-21-2 defines and specifies the quantities that shall be determined to characterize the electrical characteristics of grid-connected power plants (PP). IEC 61400-21-2 defines the measurement and test procedures for quantifying the electrical characteristics as basis for the verification of compliance of PP, including: - Power quality aspects - Steady state operation - Dynamic response (undervoltage and overvoltage fault ride-through) - Disconnection from grid (Grid protection) - Control performance IEC 61400-21-2 defines a uniform functionality test and measurement procedure for the power plant controller (PPC), as a basis for the unit test of the power plant controller. IEC 61400-21-2 defines the procedures for assessing compliance with electrical connection requirements, including the aggregation methods for power quality aspects such as voltage variations, flicker, harmonics and interharmonics. IEC 61400-21-2 defines the procedures for measurement and fault recording for the verification of power plant electrical simulation models in relation to undervoltage and overvoltage ride through events. These measurement procedures are valid for power plants, including the power plant controller and other connected equipment, necessary for the operation of the Power Plant. The measurement procedures are valid for any size of power plant connected to the point of connection (POC) at one connection point. The procedures for assessing and verifying the compliance with grid connection requirements are valid for power plants in power systems with fixed frequency and a sufficient short-circuit power. Out of the scope of this standard are: - Multi park control, i.e. cluster management of several power plants (PP) or several connection points - Compliance test and performance requirements, including pass or fail criteria - Specific component test and validation of the PP equipment (switchgear, cables, transformers, etc.), which are covered by other IEC standards - Wind power plant model validation, as defined in the IEC 61400-27-2 - Load flow calculation methods and load flow study guidelines - Test and measurement of the communication interface and system of the PP as defined in the IEC 61400-25 series NOTE For the purposes of this document, the following terms for system voltage apply, based on IEC 60038 Low voltage (LV) refers to 100 V < Un ≤ 1 kV; Medium voltage (MV) refers 106 to 1 kV < Un ≤ 35 kV; High voltage (HV) refers to 35 kV < Un ≤ 230 kV; Extra high voltage (EHV) refers to Un > 230 kV

Standards Relationship
EN 60335-2-69:2009 Identical

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.