• Shopping Cart
    There are no items in your cart

BS EN 61375-2-2:2012

Current

Current

The latest, up-to-date edition.

Electronic railway equipment. Train communication network (TCN) Wire Train Bus conformance testing

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

31-08-2012

€385.64
Excluding VAT

INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions, Abbreviations, Conventions
4 Conformance test: approach, requirements
  and boundaries
5 Conformance test of a WTB node, WTB trunk
  cable, WTB jumper cables, WTB extension cables
6 Conformance test of RTP
7 Conformance test of a WTB-equipped consist
8 Conformance test of NM
Annex A (normative) - Test laboratory role
        and client role
Annex B (informative) - Test instrumentation
        and dedicated test bed
Bibliography
Annex ZA (normative) - Normative references
         to international publications with their
         corresponding European publications
Annex ZZ (informative) - Coverage of Essential
         Requirements of EU Directives

Pertains to all equipment and devices implemented according to IEC 61375-2-1, i.e. it covers the procedures to be applied to such equipment and devices when the conformance should be proven.

Committee
GEL/9
DevelopmentNote
Supersedes 09/30205450 DC. (08/2012)
DocumentType
Standard
Pages
106
PublisherName
British Standards Institution
Status
Current
Supersedes

This part of IEC 61375 applies to all equipment and devices implemented according to IEC 61375-2-1, i.e. it covers the procedures to be applied to such equipment and devices when the conformance should be proven.

The applicability of this standard to a TCN implementation allows for individual conformance checking of the implementation itself and is a pre-requisite for further interoperability checking between different TCN implementations.

NOTE For a definition of TCN implementation see IEC 61375-2-1,1.3.

Standards Relationship
EN 61375-2-2:2012 Identical
IEC 61375-2-2:2012 Identical

ISO/IEC 9646-7:1995 Information technology Open Systems Interconnection Conformance testing methodology and framework Part 7: Implementation Conformance Statements
UIC 556 : 5ED 2009 INFORMATION TRANSMISSION IN THE TRAIN (TRAIN-BUS)
ISO/IEC 9646-6:1994 Information technology Open Systems Interconnection Conformance testing methodology and framework Part 6: Protocol profile test specification
ISO/IEC 9646-2:1994 Information technology Open Systems Interconnection Conformance testing methodology and framework Part 2: Abstract Test Suite specification
ISO/IEC 9646-4:1994 Information technology Open Systems Interconnection Conformance testing methodology and framework Part 4: Test realization
ISO/IEC 9646-5:1994 Information technology Open Systems Interconnection Conformance testing methodology and framework Part 5: Requirements on test laboratories and clients for the conformance assessment process
EN 50155:2017 Railway applications - Rolling stock - Electronic equipment
IEC 61375-1:2012 Electronic railway equipment - Train communication network (TCN) - Part 1: General architecture
IEC 60571:2012 Railway applications - Electronic equipment used on rolling stock
IEC 61375-2-1:2012 Electronic railway equipment - Train communication network (TCN) - Part 2-1: Wire Train Bus (WTB)
ISO/IEC 9646-1:1994 Information technology Open Systems Interconnection Conformance testing methodology and framework Part 1: General concepts
EN 61375-2-1 : 2012 ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 2-1: WIRE TRAIN BUS (WTB) (IEC 61375-2-1:2012)
ISO/IEC 9646-3:1998 Information technology Open Systems Interconnection Conformance testing methodology and framework Part 3: The Tree and Tabular Combined Notation (TTCN)

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.