BS EN 61375-3-2:2012
Current
The latest, up-to-date edition.
Electronic railway equipment. Train communication network (TCN) MVB (Multifunction Vehicle Bus) conformance testing
Hardcopy , PDF
English
31-08-2012
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Conformance test: approach, requirements
and boundaries
5 Conformance test of an MVB device
6 Conformance test of RTP
7 Conformance test of NM
Annex A (normative) - Test laboratory role and
client role
Annex B (informative) - Test instrumentation
and dedicated test beds
Bibliography
Annex ZA (normative) - Normative references to
international publications with their
corresponding European publications
Annex ZZ (informative) - Coverage of Essential
Requirements of EU Directives
Pertains to all equipment and devices implemented according to IEC 61375-3-1. Also covers the procedures to be applied to such equipment and devices when the conformance should be proven.
| Committee |
GEL/9
|
| DevelopmentNote |
Supersedes 09/30205458 DC. (08/2012)
|
| DocumentType |
Standard
|
| Pages |
104
|
| PublisherName |
British Standards Institution
|
| Status |
Current
|
| Supersedes |
This part of IEC 61375 applies to all equipment and devices implemented according to IEC 61375-3-1, i.e. it covers the procedures to be applied to such equipment and devices when the conformance should be proven.
The applicability of this standard to a TCN implementation allows for individual conformance checking of the implementation itself and is a pre-requisite for further interoperability checking between different TCN implementations.
NOTE 1 An example of TCN implementation is given in UIC 556.
| Standards | Relationship |
| EN 61375-3-2:2012 | Identical |
| IEC 61375-3-2:2012 | Identical |
| ISO/IEC 9646-7:1995 | Information technology — Open Systems Interconnection — Conformance testing methodology and framework — Part 7: Implementation Conformance Statements |
| EN 61375-3-1:2012 | Elektronische Betriebsmittel für Bahnen - Zug-Kommunikations-Netzwerk - Teil 3-1: Multifunction Vehicle Bus (MVB) |
| UIC 556 : 5ED 2009 | INFORMATION TRANSMISSION IN THE TRAIN (TRAIN-BUS) |
| ISO/IEC 9646-6:1994 | Information technology — Open Systems Interconnection — Conformance testing methodology and framework — Part 6: Protocol profile test specification |
| IEC 61375-2-2:2012 | Electronic railway equipment - Train communication network (TCN) - Part 2-2: Wire Train Bus conformance testing |
| ISO/IEC 9646-2:1994 | Information technology — Open Systems Interconnection — Conformance testing methodology and framework — Part 2: Abstract Test Suite specification |
| 2008/57/EC : 2008 AMD 5 2014 | DIRECTIVE 2008/1957/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL OF 17 JUNE 2008 ON THE INTEROPERABILITY OF THE RAIL SYSTEM WITHIN THE COMMUNITY (RECAST) (TEXT WITH EEA RELEVANCE) |
| ISO/IEC 9646-4:1994 | Information technology — Open Systems Interconnection — Conformance testing methodology and framework — Part 4: Test realization |
| ISO/IEC 9646-5:1994 | Information technology — Open Systems Interconnection — Conformance testing methodology and framework — Part 5: Requirements on test laboratories and clients for the conformance assessment process |
| IEC 61375-3-1:2012 | Electronic railway equipment - Train communication network (TCN) - Part 3-1: Multifunction Vehicle Bus (MVB) |
| EN 50155:2017 | Railway applications - Rolling stock - Electronic equipment |
| EN 61375-2-2:2012 | Electronic railway equipment - Train communication network (TCN) - Part 2-2: Wire Train Bus conformance testing |
| IEC 60571:2012 | Railway applications - Electronic equipment used on rolling stock |
| IEC 61375-2-1:2012 | Electronic railway equipment - Train communication network (TCN) - Part 2-1: Wire Train Bus (WTB) |
| ISO/IEC 9646-1:1994 | Information technology — Open Systems Interconnection — Conformance testing methodology and framework — Part 1: General concepts |
| IEC 60063:2015 | Preferred number series for resistors and capacitors |
| EN 61375-2-1:2012 | Electronic railway equipment - Train communication network (TCN) - Part 2-1: Wire Train Bus (WTB) |
| ISO/IEC 9646-3:1998 | Information technology — Open Systems Interconnection — Conformance testing methodology and framework — Part 3: The Tree and Tabular Combined Notation (TTCN) |
| ISO/IEC 8482:1993 | Information technology — Telecommunications and information exchange between systems — Twisted pair multipoint interconnections |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.