FOREWORD
INTRODUCTION
1 Scope and object
2 Normative references
3 Terms and definitions
4 Background explanations
5 Basic functional requirements
6 Design definition of alarms
7 Alarm signal processing
8 Alarm display processing
9 Alarm control and management
10 Alarm presentation and display-control integration
11 Reliability, testing, and maintainability
12 Alarm recording
13 Alarm response procedures (ARP)
Annex A (informative) - Problems of alarm system
Annex B (informative) - Information sources for signal used to
        generate alarms
Annex C (informative) - Examples of alarm processing logic and
        dynamic prioritization
Annex D (informative) - Conceptual example of alarm grouping
        and categorization
Annex E (informative) - Material for the need of distinction
        between alarm and status information
Annex F (informative) - Example of arrangement of alarm tiles
Annex G (informative) - Examples of points to Consider in the
        categorisation of alarms
Annex ZA (normative) - Normative references to international
         publications with their corresponding European
         publications

Gives the functional requirements for the alarm systems in the main control room of nuclear power plants.

Committee
NCE/8
DevelopmentNote
Supersedes 03/311284 DC. Renumbers and supersedes BS IEC 62241. 2015 Version incorporates corrigendum to BS IEC 62241. (03/2015) Reviewed and confirmed by BSI, August 2016. (07/2016)
DocumentType
Standard
Pages
56
PublisherName
British Standards Institution
Status
Current
Supersedes

This International Standard provides the functional requirements for the alarm systems in the main control room of nuclear power plants. It gives definitions of the terms used for alarm functions. It also establishes the human factors requirements and the design guidelines for alarm presentation for the main control room of nuclear power plants.

NOTE The alarm functions can be implemented in a dedicated system (alarm system) or preferably be an integrated part of the main control room HMI (Human-Machine Interface) system.

It specifies the alarm functions including those for the selection and definition of original alarm signals, alarm signal processing (e.g., event sequence processing, static and dynamic prioritisation), alarm display processing (e.g., alarm suppression) and the use of associated display devices (e.g., Visual Display Unit (VDU), conventional alarm fascia, mural display), with acknowledge and reset sequences, and other related matters.

Under abnormal conditions or plant transient conditions in the nuclear power plant, many alarms occur simultaneously. For this reason, the alarm functions of the main control room of nuclear power plants require special considerations for human factors engineering and system configuration, to avoid operator misunderstandings and to provide the operator with adequate information. Therefore, the scope includes special alarm functions based on human factors for monitoring and operation of nuclear power plants. It does not cover specific alarm systems, such as the fire alarm and security alarm systems.

The object of this Standard is to establish a common international understanding of the underlying functional design basis of alarm systems for control rooms, covering the corresponding functional requirements, the human factors requirements and design guidelines for the alarm functions and alarm presentation for the main control room of nuclear power plants.

This Standard therefore aims to give guidance to reduce problems which have been experienced in the past: omission of important alarms, delay in detecting important alarms, increased workload that may affect the performance of other operational activities, inattention to frequently activated alarms known as \'nuisance alarms,\' and confusion associated with the misunderstanding of the relationships among alarms and of the importance of alarms.

Standards Relationship
EN 62241:2015 Identical

IEC 61226:2009 Nuclear power plants - Instrumentation and control important to safety - Classification of instrumentation and control functions
IEC 61839:2000 Nuclear power plants - Design of control rooms - Functional analysis and assignment
IEC 61772:2009 Nuclear power plants - Control rooms - Application of visual display units (VDUs)
EN 61226:2010 Nuclear power plants - Instrumentation and control important to safety - Classification of instrumentation and control functions
EN 61772:2013 Nuclear power plants - Control rooms - Application of visual display units (VDUs)
IEC 61771:1995 Nuclear power plants - Main control-room - Verification and validation of design
IEC 60964:2009 Nuclear power plants - Control rooms - Design
EN 61839:2014 Nuclear power plants - Design of control rooms - Functional analysis and assignment

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.