• Shopping Cart
    There are no items in your cart

BS EN 62382:2007

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

Electrical and instrumentation loop check

Available format(s)

Hardcopy , PDF

Superseded date

03-01-2016

Superseded by

BS EN 62382:2013

Language(s)

English

Published date

31-05-2007

Committee
GEL/65
DocumentType
Standard
Pages
20
PublisherName
British Standards Institution
Status
Superseded
SupersededBy

describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. Is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter).

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.