BS EN 62382:2013
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Control systems in the process industry. Electrical and instrumentation loop check
Hardcopy , PDF
27-09-2024
English
31-03-2013
INTRODUCTION
1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
4 Order of loop check and cold commissioning in
the project schedule
5 Loop check content
6 Loop check procedure
7 Documents and test sheets
8 Quality assurance
9 Safety aspects
Annex A (informative) - Test report for analogue
input loop
Annex B (informative) - Test report for binary
input loop
Annex C (informative) - Test report for analogue
output loop
Annex D (informative) - Test report for binary
output loop
Annex E (informative) - Test report for motors
and variable frequency drives
Annex ZA (normative) - Normative references to
international publications with their
corresponding European publications
Defines the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning.
Committee |
GEL/65/3
|
DevelopmentNote |
Supersedes 05/30140369 DC. (05/2007) Supersedes 10/30233152 DC. (03/2013)
|
DocumentType |
Standard
|
Pages |
24
|
PublisherName |
British Standards Institution
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
IEC 62382:2012 describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). This second edition cancels and replaces the first edition published in 2006 and constitutes a technical revision. The main changes with respect to the previous edition are: The definition of the documents mentioned in the standards is in accordance with IEC 62708: Documents for Electrical and Instrumentation Projects in the Process Industry. Subclause 6.3 has been revised.
Standards | Relationship |
DIN EN 62382 : 2014 | Identical |
IEC 62382:2012 | Identical |
NBN EN 62382 : 2013 | Identical |
I.S. EN 62382:2013 | Identical |
NF EN 62382 : 2014 | Identical |
EN 62382:2013 | Identical |
IEC 60898-1:2015/COR1:2015 | Identical |
IEC 62708:2015 | Documents kinds for electrical and instrumentation projects in the process industry |
EN 62424:2016 | Representation of process control engineering - Requests in P&I diagrams and data exchange between P&ID tools and PCE-CAE tools |
EN 62337:2012 | Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones |
IEC 62337:2012 | Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones |
IEC 62424:2016 | Representation of process control engineering - Requests in P&I diagrams and data exchange between P&ID tools and PCE-CAE tools |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.