• BS EN 62446:2009

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    Grid connected photovoltaic systems. Minimum requirements for system documentation, commissioning tests and inspection

    Available format(s):  Hardcopy, PDF

    Superseded date:  23-09-2023

    Language(s):  English

    Published date:  31-01-2010

    Publisher:  British Standards Institution

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    INTRODUCTION
    1 Scope and object
    2 Normative references
    3 Terms and definitions
    4 System documentation requirements
    5 Verification
    Annex A (informative) - Model verification certificate
    Annex B (informative) - Model inspection report
    Annex C (informative) - Model PV array test report
    Annex D (informative) - PV array infrared camera
            inspection procedure
    Annex ZA (normative) - Normative references to
             international publications with their
             corresponding European publications

    Abstract - (Show below) - (Hide below)

    Specifies the minimal information and documentation required to be handed over to a customer following the installation of a grid connected PV system.

    Scope - (Show below) - (Hide below)

    This International Standard defines the minimal information and documentation required to be handed over to a customer following the installation of a grid connected PV system. This standard also describes the minimum commissioning tests, inspection criteria and documentation expected to verify the safe installation and correct operation of the system. The document can also be used for periodic retesting.

    This standard is written for grid connected PV systems only and not for AC module systems or systems that utilize energy storage (e.g. batteries) or hybrid systems.

    NOTE It is expected that additional information and commissioning tests will be required in some circumstances, e.g. for large commercial installations.

    This standard is for use by system designers and installers of grid connected solar PV systems as a template to provide effective documentation to a customer. By detailing the expected minimum commissioning tests and inspection criteria, it is also intended to assist in the verification / inspection of a grid connected PV system after installation and for subsequent re-inspection, maintenance or modifications.

    General Product Information - (Show below) - (Hide below)

    Committee GEL/82
    Development Note Supersedes 05/30141031 DC. (01/2010)
    Document Type Standard
    Publisher British Standards Institution
    Status Superseded
    Superseded By
    Supersedes

    Standards Referenced By This Book - (Show below) - (Hide below)

    BS PAS 2030(2012) : 2012 IMPROVING THE ENERGY EFFICIENCY OF EXISTING BUILDINGS - SPECIFICATION FOR INSTALLATION PROCESS, PROCESS MANAGEMENT AND SERVICE PROVISION

    Standards Referencing This Book - (Show below) - (Hide below)

    IEC 60364-7-712:2017 Low voltage electrical installations - Part 7-712: Requirements for special installations or locations - Solar photovoltaic (PV) power supply systems
    EN 61730-1:2007/A11:2014 PHOTOVOLTAIC (PV) MODULE SAFETY QUALIFICATION - PART 1: REQUIREMENTS FOR CONSTRUCTION (IEC 61730-1:2004, MODIFIED)
    IEC 60364-6:2016 Low voltage electrical installations - Part 6: Verification
    IEC TR 60755:2008 General requirements for residual current operated protective devices
    IEC 61730-1:2016 Photovoltaic (PV) module safety qualification - Part 1: Requirements for construction
    HD 60364-7-712:2016 Low-voltage electrical installations - Part 7-712: Requirements for special installations or locations - Photovoltaic (PV) systems
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective