NUCLEAR POWER PLANTS - CONTROL ROOMS - DESIGN
Hardcopy , PDF
30-06-2010
English
01-01-2009
FOREWORD
INTRODUCTION
1 Scope and object
2 Normative references
3 Terms and definitions
4 Standard use
5 Design principles for the main control room
5.1 Main objectives of the main control room
5.2 Functional design objectives of the main control
room
5.3 Safety principles
5.4 Availability principles
5.5 Human factors engineering principles
5.6 Utility operating principles
5.7 Relationship with other control and management
centres
5.8 Operational experience
6 Functional design of the main control room
6.1 General
6.2 Functional analysis
6.2.1 General
6.2.2 Identification of functions
6.2.3 Information flow and processing requirements
6.3 Assignment of functions
6.3.1 General
6.3.2 Operator capabilities
6.3.3 I&C system processing capabilities
6.4 Verification of function assignment
6.4.1 General
6.4.2 Process
6.5 Validation of function assignment
6.5.1 General
6.5.2 Process
6.5.3 General evaluation criteria for validation
6.6 Job analysis
7 Functional design specification
7.1 General
7.2 Provision of data base on human capabilities and
characteristics
7.3 Location, environment and protection
7.3.1 Location
7.3.2 Environment
7.3.3 Protection
7.4 Space and configuration
7.4.1 Space
7.4.2 Configuration
7.5 Panel layout
7.5.1 Priority
7.5.2 Positioning on control desks and panels
7.5.3 Mirror image layout
7.6 Location aids
7.6.1 Grouping of display information and controls
7.6.2 Nomenclature
7.6.3 Coding
7.6.4 Labelling
7.7 Information and control systems
7.7.1 General
7.7.2 Information functions
7.7.3 Control functions
7.8 Control-display integration
7.9 Communication systems
7.9.1 General
7.9.2 Verbal communication systems
7.9.3 Non-verbal communication systems
7.10 Other requirements
7.10.1 Power supplies
7.10.2 Qualification
7.10.3 Maintainability
7.10.4 Repairs
7.10.5 Testability
8 Verification and validation of the integrated control
room system
8.1 General
8.2 Control room system verification
8.2.1 General
8.2.2 Process
8.2.3 General evaluation criteria for integrated
system verification
8.3 Control room system validation
8.3.1 General
8.3.2 Process
8.3.3 General evaluation criteria for integrated
system validation
Annex A (informative) - Explanation of concepts
Describes requirements for the human-machine interface in the main control rooms of nuclear power plants.
Committee |
NCE/8
|
DevelopmentNote |
Supersedes 07/30135879 DC. (06/2009) Renumbered and superseded by BS EN 60964. (06/2010)
|
DocumentType |
Standard
|
Pages |
42
|
PublisherName |
British Standards Institution
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
IEC 61226:2009 | Nuclear power plants - Instrumentation and control important to safety - Classification of instrumentation and control functions |
IEC 61839:2000 | Nuclear power plants - Design of control rooms - Functional analysis and assignment |
IEC 61772:2009 | Nuclear power plants - Control rooms - Application of visual display units (VDUs) |
IEC 60980:1989 | Recommended practices for seismic qualification of electrical equipment of the safety system for nuclear generating stations |
IEC 61227:2008 | Nuclear power plants - Control rooms - Operator controls |
IEC 60965:2016 | Nuclear power plants - Control rooms - Supplementary control room for reactor shutdown without access to the main control room |
IEC 61771:1995 | Nuclear power plants - Main control-room - Verification and validation of design |
IEC 60960:1988 | Functional design criteria for a safety parameter display system for nuclear power stations |
IEC 60780:1998 | Nuclear power plants - Electrical equipment of the safety system - Qualification |
IEC 61225:2005 | Nuclear power plants - Instrumentation and control systems important to safety - Requirements for electrical supplies |
IEC 60709:2004 | Nuclear power plants - Instrumentation and control systems important to safety - Separation |
IEC 62241:2004 | Nuclear power plants - Main control room - Alarm functions and presentation |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.