    NUCLEAR POWER PLANTS - CONTROL ROOMS - DESIGN

    Available format(s):  Hardcopy, PDF

    Superseded date:  30-06-2010

    Language(s):  English

    Published date:  01-01-2009

    Publisher:  British Standards Institution

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    FOREWORD
    INTRODUCTION
    1 Scope and object
    2 Normative references
    3 Terms and definitions
    4 Standard use
    5 Design principles for the main control room
      5.1 Main objectives of the main control room
      5.2 Functional design objectives of the main control
           room
      5.3 Safety principles
      5.4 Availability principles
      5.5 Human factors engineering principles
      5.6 Utility operating principles
      5.7 Relationship with other control and management
           centres
      5.8 Operational experience
    6 Functional design of the main control room
      6.1 General
      6.2 Functional analysis
           6.2.1 General
           6.2.2 Identification of functions
           6.2.3 Information flow and processing requirements
      6.3 Assignment of functions
           6.3.1 General
           6.3.2 Operator capabilities
           6.3.3 I&C system processing capabilities
      6.4 Verification of function assignment
           6.4.1 General
           6.4.2 Process
      6.5 Validation of function assignment
           6.5.1 General
           6.5.2 Process
           6.5.3 General evaluation criteria for validation
      6.6 Job analysis
    7 Functional design specification
      7.1 General
      7.2 Provision of data base on human capabilities and
           characteristics
      7.3 Location, environment and protection
           7.3.1 Location
           7.3.2 Environment
           7.3.3 Protection
      7.4 Space and configuration
           7.4.1 Space
           7.4.2 Configuration
      7.5 Panel layout
           7.5.1 Priority
           7.5.2 Positioning on control desks and panels
           7.5.3 Mirror image layout
      7.6 Location aids
           7.6.1 Grouping of display information and controls
           7.6.2 Nomenclature
           7.6.3 Coding
           7.6.4 Labelling
      7.7 Information and control systems
           7.7.1 General
           7.7.2 Information functions
           7.7.3 Control functions
      7.8 Control-display integration
      7.9 Communication systems
           7.9.1 General
           7.9.2 Verbal communication systems
           7.9.3 Non-verbal communication systems
      7.10 Other requirements
           7.10.1 Power supplies
           7.10.2 Qualification
           7.10.3 Maintainability
           7.10.4 Repairs
           7.10.5 Testability
    8 Verification and validation of the integrated control
      room system
      8.1 General
      8.2 Control room system verification
           8.2.1 General
           8.2.2 Process
           8.2.3 General evaluation criteria for integrated
                  system verification
      8.3 Control room system validation
           8.3.1 General
           8.3.2 Process
           8.3.3 General evaluation criteria for integrated
                  system validation
    Annex A (informative) - Explanation of concepts

    Abstract - (Show below) - (Hide below)

    Describes requirements for the human-machine interface in the main control rooms of nuclear power plants.

    General Product Information - (Show below) - (Hide below)

    Committee NCE/8
    Development Note Supersedes 07/30135879 DC. (06/2009) Renumbered and superseded by BS EN 60964. (06/2010)
    Document Type Standard
    Publisher British Standards Institution
    Status Superseded
    Superseded By
    Supersedes

    Standards Referencing This Book - (Show below) - (Hide below)

    IEC 61226:2009 Nuclear power plants - Instrumentation and control important to safety - Classification of instrumentation and control functions
    IEC 61839:2000 Nuclear power plants - Design of control rooms - Functional analysis and assignment
    IEC 61772:2009 Nuclear power plants - Control rooms - Application of visual display units (VDUs)
    IEC 60980:1989 Recommended practices for seismic qualification of electrical equipment of the safety system for nuclear generating stations
    IEC 61227:2008 Nuclear power plants - Control rooms - Operator controls
    IEC 60965:2016 Nuclear power plants - Control rooms - Supplementary control room for reactor shutdown without access to the main control room
    IEC 61771:1995 Nuclear power plants - Main control-room - Verification and validation of design
    IEC 60960:1988 Functional design criteria for a safety parameter display system for nuclear power stations
    IEC 60780:1998 Nuclear power plants - Electrical equipment of the safety system - Qualification
    IEC 61225:2005 Nuclear power plants - Instrumentation and control systems important to safety - Requirements for electrical supplies
    IEC 60709:2004 Nuclear power plants - Instrumentation and control systems important to safety - Separation
    IEC 62241:2004 Nuclear power plants - Main control room - Alarm functions and presentation
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective