BS IEC 60965 : 2009
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
NUCLEAR POWER PLANTS - CONTROL ROOMS - SUPPLEMENTARY CONTROL POINTS FOR REACTOR SHUTDOWN WITHOUT ACCESS TO THE MAIN CONTROL ROOM
Hardcopy , PDF
English
01-01-2009
30-09-2011
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviations
5 Design principles
5.1 General
5.2 Main objectives
5.3 Safety principles
5.4 Human factors engineering principles
6 Design process
7 Functional design
7.1 General
7.2 Human factors
7.3 Location and access route
7.4 SCP environment
7.5 Space and configuration
7.6 Information and control equipment
7.7 Communication systems
7.8 Other equipment
8 System verification and validation
Bibliography
Specifies the requirements for the supplementary control points provided to enable the operating staff of nuclear power plants to shut down the reactor and maintain the plant in a safe shut-down state in the event that control of the safety functions can no longer be exercised from the main control room, due to unavailability of the main control room or its facilities.
| Committee |
NCE/8
|
| DevelopmentNote |
Supersedes 08/30166255 DC. (09/2009) Renumbered and superseded by BS EN 60965. (09/2011)
|
| DocumentType |
Standard
|
| Pages |
20
|
| PublisherName |
British Standards Institution
|
| Status |
Superseded
|
| SupersededBy | |
| Supersedes |
| Standards | Relationship |
| IEC 60965:2016 | Identical |