BS IEC 62241 : 2004
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
NUCLEAR POWER PLANTS - MAIN CONTROL ROOM - ALARM FUNCTIONS AND PRESENTATION
Hardcopy , PDF
31-03-2015
English
01-01-2004
FOREWORD
INTRODUCTION
1 Scope and object
2 Normative references
3 Terms and definitions
4 Background explanations
4.1 Problems of alarm systems
4.2 Functional design elements
4.3 Other elements
5 Basic functional requirements
5.1 Alarm functions
5.2 Alarm signals
5.3 Alarm signal processing
5.4 Alarm display processing
5.5 Alarm control and management
5.6 Alarm presentation and display-control integration
5.7 Human factors
5.8 Evaluation
6 Design definition of alarms
6.1 General
6.2 Key alarms
6.3 Alarms needed
7 Alarm signal processing
7.1 General
7.2 Alarm signal validation
7.3 Alarm generation and reduction processing
7.4 Event sequence and time delay processing
7.5 First-out processing
8 Alarm display processing
8.1 General
8.2 Grouped alarms
8.3 Alarm suppression
8.4 Dark-board presentation
9 Alarm control and management
9.1 General
9.2 Audible warning and silence
9.3 Flash and reflash
9.4 Acknowledgement
9.5 Ringback
9.6 Reset
10 Alarm presentation and display-control integration
10.1 General
10.2 Alarm fascia and tile
10.3 VDU alarm list display
10.4 Audible annunciation
11 Reliability, testing, and maintainability
11.1 Reliability
11.2 Testing
11.3 Maintainability
12 Alarm recording
13 Alarm response procedures (ARP)
13.1 General
13.2 Contents
13.3 Format
Annex A (informative) Problems of alarm system
Annex B (informative) Information sources for signals used
to generate alarms
Annex C (informative) Examples of alarm processing logic and
dynamic prioritisation
Annex D (informative) Conceptual example of alarm grouping
and categorisation
Annex E (informative) Material for the need of distinction
between alarm and status information
Annex F (informative) Example of arrangement of alarm tiles
Annex G (informative) Examples of Points to Consider in the
Categorisation of Alarms
Specifies the functional requirements for the alarm systems in the main control room of nuclear power plants. It provides definitions of the terms used for alarm functions and also establishes the human factors requirements and the design guidelines for alarm presentation for the main control room of nuclear power plants.
Committee |
NCE/8
|
DevelopmentNote |
Supersedes 03/311284 DC (11/2004) Reviewed and confirmed by BSI, March 2015. (03/2015) Renumbered and superseded by BS EN 62241. (03/2015)
|
DocumentType |
Standard
|
Pages |
54
|
PublisherName |
British Standards Institution
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
Standards | Relationship |
IEC 62241:2004 | Identical |
IEC 61226:2009 | Nuclear power plants - Instrumentation and control important to safety - Classification of instrumentation and control functions |
IEC 61839:2000 | Nuclear power plants - Design of control rooms - Functional analysis and assignment |
IEC 61772:2009 | Nuclear power plants - Control rooms - Application of visual display units (VDUs) |
IEC 61771:1995 | Nuclear power plants - Main control-room - Verification and validation of design |
IEC 60964:2009 | Nuclear power plants - Control rooms - Design |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.