CECC 00806 : 1994
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
GUIDE TO TOTAL QUALITY MANAGEMENT (TQM) FOR CECC APPROVED ORGANIZATIONS
02-06-2016
12-01-2013
1 Purpose of this Guidance Document
2 What is Total Quality Management (TQM)?
2.1 Introduction
2.2 Definitions
3 Why TQM
4 Established approaches to TQM
4.1 Standards and guidelines relevant to TQM
4.2 Application of TQM to electronics companies and
their customers' organizations
4.2.1 Structures and programmes
4.2.2 Company awards
4.3 TQM methodology
4.3.1 Methods, tools and techniques used in TQM
4.3.2 Methods, tools and techniques used in
process management
4.3.3 General procedures and tools
4.4 Award systems
4.5 The European Foundation for Quality Management
4.5.1 Status
4.5.2 Purpose
4.5.3 E.F.Q.M. statement on 'why Europe needs
quality management'
4.5.4 The European Quality Award
4.5.5 Relationships to national quality
organisations
5 Implementation: How to start a TQM programme and ensure
it continues
5.1 The multinational company approach
5.2 The plan-execute-harvest approach
5.3 The Plan-Do-Check-Act (PDCA) programme
5.4 Step by step models
6 Achievement
6.1 Methods of measurement
6.2 Stages of self-assessment
7 Relationship between CECC approvals and the TQM Concept
8 CECC's position on TQM
Annex A: Models and Definitions of TQM
Annex B: Company approaches to TQM
Annex C: Specific techniques used in TQM programmes
Annex D: References
Gives a european system of standards and certification for all companies involved with the design, manufacture, distribution and use of electronic components, together with related services. It is intended to help CECC approved companies to consider parallel requirements for implementing CECC and TQM practices.
DocumentType |
Standard
|
PublisherName |
Cenelec Electronic Components Committee
|
Status |
Withdrawn
|
Standards | Relationship |
BS CECC 00806:1997 | Identical |
PD R086-001:2000 | Guidance for technology audit of fibre optic connector kits and terminated connectors |
96/205775 DC : 0 | BS CECC 210003 - TECHNOLOGY APPROVAL SCHEDULE FOR PRINTED BOARDS |
BS CECC 299001:1999 | Technology approval schedule. Manufacture of electrical connectors |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.