• Shopping Cart
    There are no items in your cart

CEI EN 60965 : 2012

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

NUCLEAR POWER PLANTS - CONTROL ROOMS - SUPPLEMENTARY CONTROL ROOM FOR REACTOR SHUTDOWN WITHOUT ACCESS TO THE MAIN CONTROL ROOM

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

01-01-2012

Superseded date

26-07-2025

Superseded by

CEI EN 60965:2017-07

€40.00
Excluding VAT
Summarise this standard

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviations
5 Design principles
6 Design process
7 Functional design
8 System verification and validation
Annex A (informative) - Assessment of safe transfer time window
Bibliography
Annex ZA (normative) - Normative references to international
         publications with their corresponding European
         publications

Sets up requirements for the Supplementary Control Room provided to enable the operating staff of nuclear power plants to shut down the reactor, where previously operating, and maintain the plant in a safe shut-down state in the event that control of the safety functions can no longer be exercised from the Main Control Room, due to unavailability of the Main Control Room or its facilities.

Committee
CT 45
DevelopmentNote
Classificazione CEI 45-71. (02/2012) 1ED 2012 Edition is valid until 18-07-2019. (08/2017)
DocumentType
Standard
Pages
24
PublisherName
Comitato Elettrotecnico Italiano
Status
Superseded
SupersededBy

Standards Relationship
EN 60965:2016 Identical
IEC 60965:2016 Identical

⚠

A newer version of this standard is available.

View Current Edition
€40.00
Excluding VAT