CEI EN 60965 : 2012
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
NUCLEAR POWER PLANTS - CONTROL ROOMS - SUPPLEMENTARY CONTROL ROOM FOR REACTOR SHUTDOWN WITHOUT ACCESS TO THE MAIN CONTROL ROOM
Hardcopy , PDF
English
01-01-2012
26-07-2025
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviations
5 Design principles
6 Design process
7 Functional design
8 System verification and validation
Annex A (informative) - Assessment of safe transfer time window
Bibliography
Annex ZA (normative) - Normative references to international
publications with their corresponding European
publications
Sets up requirements for the Supplementary Control Room provided to enable the operating staff of nuclear power plants to shut down the reactor, where previously operating, and maintain the plant in a safe shut-down state in the event that control of the safety functions can no longer be exercised from the Main Control Room, due to unavailability of the Main Control Room or its facilities.
| Committee |
CT 45
|
| DevelopmentNote |
Classificazione CEI 45-71. (02/2012) 1ED 2012 Edition is valid until 18-07-2019. (08/2017)
|
| DocumentType |
Standard
|
| Pages |
24
|
| PublisherName |
Comitato Elettrotecnico Italiano
|
| Status |
Superseded
|
| SupersededBy |
| Standards | Relationship |
| EN 60965:2016 | Identical |
| IEC 60965:2016 | Identical |