CEI EN 61375-2-2 : 2013
Current
The latest, up-to-date edition.
ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 2-2: WIRE TRAIN BUS CONFORMANCE TESTING
Hardcopy , PDF
English
01-01-2013
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions, Abbreviations,
Conventions
4 Conformance test: approach, requirements
and boundaries
5 Conformance test of a WTB node, WTB trunk
cable, WTB jumper cables, WTB extension cables
6 Conformance test of RTP
7 Conformance test of a WTB-equipped consist
8 Conformance test of NM
Annex A (normative) - Test laboratory role and
client role
Annex B (informative) - Test instrumentation
and dedicated test bed
Bibliography
Annex ZA (normative) - Normative references to
international publications with their
corresponding European publications
Annex ZZ (informative) - Coverage of Essential
Requirements of EU Directives
Pertains to all equipment and devices implemented according to IEC 61375-2-1. Also covers the procedures to be applied to such equipment and devices when the conformance should be proven.
Committee |
CT 9
|
DevelopmentNote |
Classificazione CEI 9-146. (02/2013)
|
DocumentType |
Standard
|
Pages |
108
|
PublisherName |
Comitato Elettrotecnico Italiano
|
Status |
Current
|
Standards | Relationship |
EN 61375-2-2:2012 | Identical |
IEC 61375-2-2:2012 | Identical |
ISO/IEC 9646-7:1995 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 7: Implementation Conformance Statements |
UIC 556 : 5ED 2009 | INFORMATION TRANSMISSION IN THE TRAIN (TRAIN-BUS) |
ISO/IEC 9646-6:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 6: Protocol profile test specification |
ISO/IEC 9646-2:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 2: Abstract Test Suite specification |
ISO/IEC 9646-4:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 4: Test realization |
ISO/IEC 9646-5:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 5: Requirements on test laboratories and clients for the conformance assessment process |
IEC 61375-1:2012 | Electronic railway equipment - Train communication network (TCN) - Part 1: General architecture |
IEC 60571:2012 | Railway applications - Electronic equipment used on rolling stock |
IEC 61375-2-1:2012 | Electronic railway equipment - Train communication network (TCN) - Part 2-1: Wire Train Bus (WTB) |
ISO/IEC 9646-1:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 1: General concepts |
EN 61375-2-1 : 2012 | ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 2-1: WIRE TRAIN BUS (WTB) (IEC 61375-2-1:2012) |
ISO/IEC 9646-3:1998 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 3: The Tree and Tabular Combined Notation (TTCN) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.