• There are no items in your cart

CEI EN 62381 : 2013

Current

Current

The latest, up-to-date edition.

AUTOMATION SYSTEMS IN THE PROCESS INDUSTRY - FACTORY ACCEPTANCE TEST (FAT), SITE ACCEPTANCE TEST (SAT) AND SITE INTEGRATION TEST (SIT)

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

01-01-2013

€198.45
Excluding VAT

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
4 General preparation before conducting the FAT
5 Factory acceptance test
6 Site acceptance test
7 Site integration test
Annex A (informative) - FAT test report
Annex B (informative) - SAT check list
Annex C (informative) - SIT check list
Annex D (informative) - FAT certificate
Annex E (informative) - SAT certificate
Annex F (informative) - SIT certificate
Annex G (informative) - Automation system
        acceptance certificate
Annex H (informative) - FAT punch list
Annex I (informative) - SAT punch list
Annex J (informative) - SIT punch list
Bibliography

Describes procedures and specifications for the Factory Acceptance Test (FAT), the Site Acceptance Test (SAT), and the Site Integration Test (SIT).

Committee
CT 65
DevelopmentNote
Classificazione CEI 65-104. (08/2007)
DocumentType
Standard
Pages
46
PublisherName
Comitato Elettrotecnico Italiano
Status
Current

Standards Relationship
IEC 62381:2012 Identical
EN 62381:2012 Identical

IEC 62708:2015 Documents kinds for electrical and instrumentation projects in the process industry
IEC 62337:2012 Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.