CGA G 1-8 : 2017
Current
The latest, up-to-date edition.
GUIDELINE FOR THE OPERATION AND CLOSURE OF CARBIDE LIME PONDS
Hardcopy
English
01-02-2017
1 Introduction
2 Scope and purpose
3 Definitions
4 Carbide lime technical issues
5 Regulatory issues for carbide lime
6 Potential environmental issues
7 Lime pond operation and maintenance
8 Lime pond closure procedures
9 References
Appendices
Appendix A - Phase I checklist - facility and lime
impoundment characteristics (Informative)
Appendix B - Phase I checklist - regulatory
requirements (Informative)
Specifies important environmental and safety information regarding the proper operation and closure of carbide lime ponds.
DocumentType |
Standard
|
Pages |
14
|
PublisherName |
Compressed Gas Association
|
Status |
Current
|
Supersedes |
NFPA 51A : 2012 | ACETYLENE CYLINDER CHARGING PLANTS |
CGA G 1.5 : 2015 | CARBIDE LIME: ITS VALUE AND USES |
CGA G 1.10 : 2017 | GUIDELINE FOR THE SAFE OPERATION OF ACETYLENE GENERATORS |
CGA G 1.5 : 2015 | CARBIDE LIME: ITS VALUE AND USES |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.