• Shopping Cart
    There are no items in your cart

CSA C308 : 1985

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

View Superseded by

THE PRINCIPLES AND PRACTICE OF INSULATION COORDINATION

Available format(s)

Hardcopy , PDF

Withdrawn date

23-07-2013

Superseded by

CSA C308 : M85 (R1999)

Language(s)

English

Published date

01-01-1999

€40.38
Excluding VAT

Three phase ac electric power systems insulation coordination. Covers both phase to ground and phase to phase insulation, nominal system voltages above 1kV.

DocumentType
Standard
Pages
95
PublisherName
Canadian Standards Association
Status
Withdrawn
SupersededBy

CAN/CSA-C156.3-M86 (R2013) Test Methods for Station Post Insulators
CSA C156.3 : 1986 : R1999 TEST METHODS FOR STATION POST INSULATORS
CSA C156.1 : 1986 : R2004 CERAMIC AND GLASS STATION POST INSULATORS
CSA C156.3 : 1986 : R2009 TEST METHODS FOR STATION POST INSULATORS
CSA C22.3 No. 8 : 1991 RAILWAY ELECTRIFICATION GUIDELINES
CSA C156.1 : 1986 : R2013 CERAMIC AND GLASS STATION POST INSULATORS
CSA C13 : 0 INSTRUMENT TRANSFORMERS
CSA C233.1 : 1987 GAPLESS METAL OXIDE SURGE ARRESTERS FOR ALTERNATING CURRENT SYSTEMS
CSA C156.3 : 1986 : R2004 TEST METHODS FOR STATION POST INSULATORS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.