This Standard provides rules and requirements for the design, fabrication, erection, inspection, testing, maintenance, and use of falsework and formwork materials, components, and systems where they are erected to provide temporary vertical and lateral support or containment of freshly placed concrete for buildings and other structures during their construction, alteration, or repair, and includes the reshore of new slab systems that have not achieved full strength.