DD ENV 1292:1995
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
Identification card systems. Integrated circuit(s) cards and interface services. Additional test methods
Hardcopy , PDF
15-11-2002
English
15-09-1995
1 Scope
2 Normative References
3 Definitions and abbreviations
3.1 definitions
3.1.1 core recommendations: The documents device under
testing which the customer describes to the testing
institution a precise set of tests and its suite
3.2 abbreviations
4 Test methods
4.1 ICC Electrical tests
4.1.1 I/O contact
4.1.2 Fall and rise times for I/O contact
4.1.3 VPP contact
4.1.4 CLK current
4.1.5 RST current
4.1.6 VCC current
4.2 IFD ELECTRICAL TESTS
4.2.1 Spurious voltage on outputs
4.2.2 Activation of contacts
4.2.3 VCC voltage
4.2.4 VPP contact
4.2.5 Input/Output contact
4.2.6 CLK contact
4.2.7 RST voltage
4.2.8 Card Reset
4.2.9 Deactivation of the contacts
4.2.10 Detection of card removal
4.3 ICC COMMUNICATION TESTS
4.3.1 Testing tool specifications
4.3.2 Answer to reset (ATR) timing
4.3.3 Character repetition
4.3.4 Parity error detection
4.3.5 Structure and content of ATR
4.3.6 Global characters
4.3.7 Interface characters (TAi, TBi, TCi, TDi)
4.3.8 Character Waiting Time (CWT)
4.3.9 Block Guardtime (BGT)
4.3.10 Block sequencing by the card
4.3.11 Reactions of the ICC to protocol errors
4.3.12 Recovery of a transmission error by the ICC
4.3.13 Resynchronisation
4.3.14 IFSD negotiation
4.3.15 Abortion by the IFD
4.4 IFD PHYSICAL TESTS
4.4.1 IFD location of the contacts
4.4.2 Insertion/withdrawing forces
4.4.3 Pushing force on the ICC contacts
4.4.4 Physical damage
4.4.5 Heat dissipation
4.5 IFD COMMUNICATION TESTS
4.5.1 Character repetition
4.5.2 Character frame
4.5.3 Structure of a command header for T=0 protocol
4.5.4 VPP request for T=0
4.5.5 Character Waiting Time (CWT)
4.5.6 Block Guardtime (BGT)
4.5.7 Block sequencing by the IFD
4.5.8 Reactions of the IFD to invalid PCBs
4.5.9 Recovery of a transmission error by the IFD
4.5.10 IFSC negotiation
4.5.11 Abortion by the ICC
4.5.12 Recovery of an error in an S(RESYNCH response) block
Committee |
IST/17
|
DocumentType |
Standard
|
Pages |
34
|
PublisherName |
British Standards Institution
|
Status |
Withdrawn
|
Standards | Relationship |
ENV 1292 : DRAFT 1995 | Identical |
SNV DD ENV 1292 : 1995 | Identical |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.