• DD IEC TS 62257-4 : DRAFT 2005

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    RECOMMENDATIONS FOR SMALL RENEWABLE ENERGY AND HYBRID SYSTEMS FOR RURAL ELECTRIFICATION - PART 4: SYSTEM SELECTION AND DESIGN

    Available format(s): 

    Superseded date:  31-01-2016

    Language(s): 

    Published date:  23-11-2012

    Publisher:  British Standards Institution

    Sorry this product is not available in your region.

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    FOREWORD
    INTRODUCTION
    1 Scope
    2 Normative references
    3 Terms and definitions
    4 Functional requirements of production and distribution
      subsystems
      4.1 Preliminaries
      4.2 Overall needs to be satisfied
      4.3 Introduction to subsystems
      4.4 Functional description of a production subsystem
      4.5 Functional description of a distribution subsystem
      4.6 Functional description of a demand subsystem
      4.7 Constraints to be complied with by production
          distribution and demand subsystems
    5 Energy management rules
      5.1 General
      5.2 Functional description for an energy management of
          an isolated system
      5.3 Demand side management
    6 Expected results from the sizing process
      6.1 Introduction
      6.2 Participants in the sizing process
      6.3 Elements for comparing various design proposals
      6.4 Frameworks for proposal
      6.5 Proposal for a sizing process
      6.6 Impact of design assumptions on system sizing and cost
      6.7 Guarantee of results
    7 Data acquisition rules for system management
      7.1 Introduction
      7.2 General
      7.3 Levels of data acquisition and data necessity
      7.4 Data to be collected
      7.5 Operating conditions, electrical and engineering
          requirements for data acquisition
    Annex A (informative) Example for detailed performance
            criteria and levels for a production subsystem
    Annex B (informative) Example for detailed performance
            criteria and levels for a distribution subsystem
    Annex C (informative) Example framework for proposal
            specification
    Annex D (informative) Equation for costs calculations
    Annex E (informative) Proposal for a sizing process

    Abstract - (Show below) - (Hide below)

    Gives a method for describing the results to be achieved by the electrification system independently of the technical solutions that could be implemented.

    General Product Information - (Show below) - (Hide below)

    Comment Closes On
    Committee GEL/82
    Development Note Supersedes 03/318810 DC. (01/2006)
    Document Type Draft
    Publisher British Standards Institution
    Status Superseded
    Superseded By
    Supersedes

    Standards Referencing This Book - (Show below) - (Hide below)

    IEC TS 62257-1:2015 Recommendations for renewable energy and hybrid systems for rural electrification - Part 1: General introduction to IEC 62257 series and rural electrification
    IEC TS 62257-5:2015 Recommendations for renewable energy and hybrid systems for rural electrification - Part 5: Protection against electrical hazards
    IEC TS 62257-2:2015 Recommendations for renewable energy and hybrid systems for rural electrification - Part 2: From requirements to a range of electrification systems
    IEC TS 62257-3:2015 Recommendations for renewable energy and hybrid systems for rural electrification - Part 3: Project development and management
    IEC TS 62257-6:2015 Recommendations for renewable energy and hybrid systems for rural electrification - Part 6: Acceptance, operation, maintenance and replacement
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective