• Shopping Cart
    There are no items in your cart

DEFSTAN 00-045(PT1)/4(2016) : 2016

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

USING RELIABILITY CENTRED MAINTENANCE TO MANAGE ENGINEERING FAILURES - PART 1: REQUIREMENTS FOR THE APPLICATION OF RELIABILITY CENTRED MAINTENANCE

Withdrawn date

08-01-2017

Published date

09-01-2017

Sorry this product is not available in your region.

Foreword
0 Introduction
1 Scope
2 Warning
3 Normative References
4 Abbreviations
5 Definitions
6 Additional Information
7 The RCM Methodology

Describes how maintenance programmes shall be derived for MOD owned or operated assets.

DevelopmentNote
Supersedes DEFSTAN 00-45(PT1)/3(2012). (01/2017)
DocumentType
Standard
PublisherName
UK Ministry of Defence Standards
Status
Withdrawn
Supersedes

DEFSTAN 00-600/3(2014) : 2014 INTEGRATED LOGISTIC SUPPORT - REQUIREMENTS FOR MOD PROJECTS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.