DEFSTAN 00-045(PT1)/4(2016) : 2016
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
USING RELIABILITY CENTRED MAINTENANCE TO MANAGE ENGINEERING FAILURES - PART 1: REQUIREMENTS FOR THE APPLICATION OF RELIABILITY CENTRED MAINTENANCE
08-01-2017
09-01-2017
Foreword
0 Introduction
1 Scope
2 Warning
3 Normative References
4 Abbreviations
5 Definitions
6 Additional Information
7 The RCM Methodology
Describes how maintenance programmes shall be derived for MOD owned or operated assets.
DevelopmentNote |
Supersedes DEFSTAN 00-45(PT1)/3(2012). (01/2017)
|
DocumentType |
Standard
|
PublisherName |
UK Ministry of Defence Standards
|
Status |
Withdrawn
|
Supersedes |
DEFSTAN 00-600/3(2014) : 2014 | INTEGRATED LOGISTIC SUPPORT - REQUIREMENTS FOR MOD PROJECTS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.