DEFSTAN 00-40(PT1)/7(2012) : 2012
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
RELIABILITY AND MAINTAINABILITY - PART 1: MANAGEMENT RESPONSIBILITIES AND REQUIREMENTS FOR PROGRAMMES AND PLANS
Hardcopy , PDF
28-10-2017
English
01-01-2012
Foreword
0 Introduction
1 Scope
2 Warning
3 References
4 Definitions
5 Sponsors (Customer) Responsibilities
6 Procuring Authority (Purchaser) Responsibilities
7 Supplier (Contractor) Responsibility
8 R&M and Integrated Logistics Support
9 Introduction
10 Suppliers (Contractors) Responsibilities
11 Progressive Assurance and the R&M Case
Gives a general introduction to the means of achieving R&M and details the specific measures to be adopted by the MOD Sponsors, the Project Managers and the contractors.
DevelopmentNote |
Supersedes DEFSTAN 00-40(PT1)/6(2008). (04/2012)
|
DocumentType |
Standard
|
Pages |
14
|
PublisherName |
UK Ministry of Defence Standards
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
DEFSTAN 08-107/3(2013) : 2013 | GENERAL REQUIREMENTS FOR THE DESIGN OF ELECTROTECHNICAL AND NAVAL WEAPON EQUIPMENT |
DEFSTAN 00-42(PT4)/3(2014) : 2014 | RELIABILITY AND MAINTAINABILITY ACTIVITY - PART 4: TESTABILITY |
DEFSTAN 00-44/2(2012) : 2012 | RELIABILITY AND MAINTAINABILITY DATA COLLECTION AND CLASSIFICATION |
DEFSTAN 02-343/4(2013) : 2013 | REQUIREMENTS FOR EMERGENCY BREATHING SYSTEMS (EBS) IN SUBMARINES |
DEFSTAN 00-42(PT3)/4(2011) : 2011 | RELIABILITY AND MAINTAINABILITY ASSURANCE GUIDE - PART 3: R&M CASE |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.