DEFSTAN 00-40(PT8)/1(1992) : 1992
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
RELIABILITY AND MAINTAINABILITY - PART 8: PROCUREMENT OF OFF-THE-SHELF EQUIPMENT (ARMP-8)
09-01-2002
12-01-2013
Gives advice on the measures to be taken for achieving acceptable levels of R&M in the procurement of Off-the Shelf (OTS) equipment. Coverage includes: OTS procurement process start; staff requirement; decision to proceed to tender; final programme considerations; R&M aspects of the specification; market investigation.
DocumentType |
Standard
|
PublisherName |
UK Ministry of Defence Standards
|
Status |
Withdrawn
|
DEFSTAN 00-60(PT2)/5(2002) : 2002 | INTEGRATED LOGISTIC SUPPORT GUIDE TO THE APPLICATION OF LSA AND LSAR |
DEFSTAN 00-60(PT20)/6(2002) : 2002 | INTEGRATED LOGISTIC SUPPORT - PART 20: APPLICATION OF INTEGRATED SUPPLY SUPPORT PROCEDURES |
DEFSTAN 00-60(PT22)/4(2003) : 2003 | INTEGRATED LOGISTIC SUPPORT PROCEDURES FOR CODIFICATION |
DEFSTAN 00-60(PT0)/4(2000) : 2000 | INTEGRATED LOGISTIC SUPPORT PART 0: APPLICATION OF INTEGRATED LOGISTIC SUPPORT (ILS) |
DEFSTAN 00-60(PT3)/2(1998) : 1998 | INTEGRATED LOGISTIC SUPPORT - PART 3: GUIDANCE FOR APPLICATION SOFTWARE SUPPORT |
DEFSTAN 00-60(PT0)/5(2002) : 2002 CORR 2004 | INTEGRATED LOGISTIC SUPPORT - PART 0: APPLICATION OF INTEGRATED LOGISTIC SUPPORT (ILS) |
DEFSTAN 00-60(PT21)/5(2002) : 2002 | INTEGRATED LOGISTIC SUPPORT - PART 21: PROCEDURES FOR INITIAL PROVISIONING |
DEFSTAN 00-60(PT25)/2(1998) : 1998 | INTEGRATED LOGISTIC SUPPORT - PART 25: PROCEDURES FOR INVOICING |
DEFSTAN 00-60(PT24)/4(2000) : 2000 | INTEGRATED LOGISTIC SUPPORT PART 24: PROCEDURES FOR ORDER ADMINISTRATION |
DEFSTAN 00-60(PT23)/2(1998) : 1998 | INTEGRATED LOGISTIC SUPPORT - PART 23: PROCEDURES FOR PROCUREMENT PLANNING |
DEFSTAN 00-60(PT1)/2(1998) : 1998 | INTEGRATED LOGISTIC SUPPORT - PART 1: LOGISTIC SUPPORT ANALYSIS (LSA) AND LOGISTIC SUPPORT ANALYSIS RECORD (LSAR) |
DEFSTAN 02-339/2(2002) : INTERIM | REQUIREMENTS FOR STEERING AND STABILIZER SYSTEMS FOR HM SURFACE SHIPS AND ROYAL FLEET AUXILIARIES |
DEFSTAN 00-25(PT14)/1(2000) : 2000 | HUMAN FACTORS FOR DESIGNERS OF EQUIPMENT - PART 14: MILITARY LAND VEHICLE DESIGN |
DEFSTAN 00-60(PT21)/4(2000) : 2000 | INTEGRATED LOGISTIC SUPPORT PART 21: PROCEDURES FOR INITIAL PROVISIONING |
DEFSTAN 02-309/2(2002) : 2002 | REQUIREMENTS FOR GAS TURBINES |
DEFSTAN 00-60(PT24)/5(2002) : 2002 | INTEGRATED LOGISTIC SUPPORT - PART 24: PROCEDURES FOR ORDER ADMINISTRATION |
DEFSTAN 00-40(PT1)/2(1987) : 1987 | RELIABILITY AND MAINTAINABILITY - PART 1: MANAGEMENT RESPONSIBILITIES AND REQUIREMENTS FOR PROGRAMMES AND PLANS |
ARMP-8 : 1991 | RELIABILITY & MAINTAINABILITY (R&M) IN THE PROCUREMENT OF OFF-THE-SHELF (OTS) EQUIPMENT |
DEFSTAN 00-40(PT2)/1(1988) : 1988 | RELIABILITY AND MAINTAINABILITY - PART 2: GENERAL APPLICATION GUIDANCE ON THE USE OF PART 1 (ARMP-1) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.