• DEFSTAN 00-40(PT8)/1(1992) : 1992

    Withdrawn A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

    RELIABILITY AND MAINTAINABILITY - PART 8: PROCUREMENT OF OFF-THE-SHELF EQUIPMENT (ARMP-8)

    Available format(s): 

    Withdrawn date:  09-01-2002

    Language(s): 

    Published date:  12-01-2013

    Publisher:  UK Ministry of Defence Standards

    Sorry this product is not available in your region.

    Add To Cart

    Abstract - (Show below) - (Hide below)

    Gives advice on the measures to be taken for achieving acceptable levels of R&M in the procurement of Off-the Shelf (OTS) equipment. Coverage includes: OTS procurement process start; staff requirement; decision to proceed to tender; final programme considerations; R&M aspects of the specification; market investigation.

    General Product Information - (Show below) - (Hide below)

    Document Type Standard
    Publisher UK Ministry of Defence Standards
    Status Withdrawn

    Standards Referenced By This Book - (Show below) - (Hide below)

    DEFSTAN 00-60(PT2)/5(2002) : 2002 INTEGRATED LOGISTIC SUPPORT GUIDE TO THE APPLICATION OF LSA AND LSAR
    DEFSTAN 00-60(PT20)/6(2002) : 2002 INTEGRATED LOGISTIC SUPPORT - PART 20: APPLICATION OF INTEGRATED SUPPLY SUPPORT PROCEDURES
    DEFSTAN 00-60(PT22)/4(2003) : 2003 INTEGRATED LOGISTIC SUPPORT PROCEDURES FOR CODIFICATION
    DEFSTAN 00-60(PT0)/4(2000) : 2000 INTEGRATED LOGISTIC SUPPORT PART 0: APPLICATION OF INTEGRATED LOGISTIC SUPPORT (ILS)
    DEFSTAN 00-60(PT3)/2(1998) : 1998 INTEGRATED LOGISTIC SUPPORT - PART 3: GUIDANCE FOR APPLICATION SOFTWARE SUPPORT
    DEFSTAN 00-60(PT0)/5(2002) : 2002 CORR 2004 INTEGRATED LOGISTIC SUPPORT - PART 0: APPLICATION OF INTEGRATED LOGISTIC SUPPORT (ILS)
    DEFSTAN 00-60(PT21)/5(2002) : 2002 INTEGRATED LOGISTIC SUPPORT - PART 21: PROCEDURES FOR INITIAL PROVISIONING
    DEFSTAN 00-60(PT25)/2(1998) : 1998 INTEGRATED LOGISTIC SUPPORT - PART 25: PROCEDURES FOR INVOICING
    DEFSTAN 00-60(PT24)/4(2000) : 2000 INTEGRATED LOGISTIC SUPPORT PART 24: PROCEDURES FOR ORDER ADMINISTRATION
    DEFSTAN 00-60(PT23)/2(1998) : 1998 INTEGRATED LOGISTIC SUPPORT - PART 23: PROCEDURES FOR PROCUREMENT PLANNING
    DEFSTAN 00-60(PT1)/2(1998) : 1998 INTEGRATED LOGISTIC SUPPORT - PART 1: LOGISTIC SUPPORT ANALYSIS (LSA) AND LOGISTIC SUPPORT ANALYSIS RECORD (LSAR)
    DEFSTAN 02-339/2(2002) : INTERIM REQUIREMENTS FOR STEERING AND STABILIZER SYSTEMS FOR HM SURFACE SHIPS AND ROYAL FLEET AUXILIARIES
    DEFSTAN 00-25(PT14)/1(2000) : 2000 HUMAN FACTORS FOR DESIGNERS OF EQUIPMENT - PART 14: MILITARY LAND VEHICLE DESIGN
    DEFSTAN 00-60(PT21)/4(2000) : 2000 INTEGRATED LOGISTIC SUPPORT PART 21: PROCEDURES FOR INITIAL PROVISIONING
    DEFSTAN 02-309/2(2002) : 2002 REQUIREMENTS FOR GAS TURBINES
    DEFSTAN 00-60(PT24)/5(2002) : 2002 INTEGRATED LOGISTIC SUPPORT - PART 24: PROCEDURES FOR ORDER ADMINISTRATION

    Standards Referencing This Book - (Show below) - (Hide below)

    DEFSTAN 00-40(PT1)/2(1987) : 1987 RELIABILITY AND MAINTAINABILITY - PART 1: MANAGEMENT RESPONSIBILITIES AND REQUIREMENTS FOR PROGRAMMES AND PLANS
    ARMP-8 : 1991 RELIABILITY & MAINTAINABILITY (R&M) IN THE PROCUREMENT OF OFF-THE-SHELF (OTS) EQUIPMENT
    DEFSTAN 00-40(PT2)/1(1988) : 1988 RELIABILITY AND MAINTAINABILITY - PART 2: GENERAL APPLICATION GUIDANCE ON THE USE OF PART 1 (ARMP-1)
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective