Foreword
Introduction
SECTION 1 - GENERAL REQUIREMENTS1
1 Scope
2 Warning
3 References
4 Definitions
4.1 Built In Test (BIT)
4.2 Built In Test Equipment (BITE)
4.3 Depth of Test
4.4 External Test System
4.5 Failure
4.6 Failure Detection
4.7 Failure Isolation
4.8 Failure Localisation
4.9 False Alarm
4.10 Fault Tolerant Design
4.11 No Fault Found
4.12 Prognostics
4.13 Testability
4.14 Test Effectiveness
4.15 Test Coverage
5 Abbreviations
SECTION 2 - TESTABILITY
6 TESTABILITY PROCESS
6.1 Introduction
6.2 Region of Testability
6.3 Test Coverage
6.4 Failure Detection
6.5 Failure Localisation
6.6 Failure Isolation
6.7 No Fault Found
7 FAULT TOLERANT DESIGN
7.1 Redundant and Re-Configurable Systems
7.2 Artificial Intelligence
8 PROGNOSTICS
9 TESTABILITY MEASURES
9.1 Test Coverage
9.2 Failure Detection
9.3 False Alarms
9.4 Failure Localisation
9.5 Failure Isolation
10 TESTABILITY AND THE R&M CASE
11 TESTABILITY RISK
11.1 Introduction
11.2 Reliability Impact
11.3 Maintainability Impact
11.4 Availability Impact
12 CONTRACTING FOR TESTABILITY
12.1 Introduction
12.2 Test Documentation
12.3 Configuration Management
12.4 Verification and Validation of Testability
12.5 The Testability of the Test System
12.6 Demonstration