DEFSTAN 00-45(PT2)/2(2008) : 2008
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
USING RELIABILITY CENTRED MAINTENANCE TO MANAGE ENGINEERING FAILURES - PART 2: DEVELOPING AN RCM PROJECT PLAN
Hardcopy , PDF
28-11-2012
English
01-01-2008
Foreword
1 Scope
2 Warning
3 The Elements of RCM
3.1 Scoping the Analysis
3.2 End Item Operating Context
3.3 Functional Partitioning
3.4 Functionally and Structurally Significant Candidate
Selection
3.5 Compartments or Zonal Plan
3.6 Analysis Level Operating Context
3.7 Functional Analysis
3.8 RCM Decision Logic
3.9 Redesign and Change Action
3.10 Task Packaging
4 Zonal and External Surface Areas Analysis
5 RCM Team Construction and RCM Analysis Stakeholders
6 Assumptions, Constraints and General Information
7 Data Recording and Presentation
8 Auditing
9 Age Exploration
10 RCM Analysis Progression Chart
11 RCM Deliverables
12 Schedules Production and Distribution
13 Implementation of the Maintenance Programme
14 Reviewing the Maintenance Programme
Annex A - Reliability Centred Maintenance Project Plan
A.1 Introduction
Provides instruction on how to produce a Reliability Centred Maintenance Project Plan (RCMPP).
DevelopmentNote |
Supersedes DEFSTAN 00-45(PT2)/1(2006). (02/2008)
|
DocumentType |
Standard
|
Pages |
28
|
PublisherName |
UK Ministry of Defence Standards
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
DEFSTAN 02-309/3(2007) : 2007 | REQUIREMENTS FOR GAS TURBINES |
DEFSTAN 02-305/3(2010) : 2010 | REQUIREMENTS FOR GEARING - MAIN PROPULSION |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.