• Shopping Cart
    There are no items in your cart

DEFSTAN 00-60(PT2)/1(1996) : 1996

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

INTEGRATED LOGISTIC SUPPORT - GUIDE TO THE APPLICATION OF LSA AND LSAR

Superseded date

31-03-1998

Published date

12-01-2013

Sorry this product is not available in your region.

Section One. General
0 Introduction
1 Scope
2 Related Documents
3 Definitions
4 Abbreviations
5 LSA and LSAR
Section Two. Management
6 LSA and LSAR Management
Section Three. Application of LSA and LSAR to Projects
7 LSA Process
8 Tailoring
9 Data Transfer
Table 1 LSA Task Responsibilities
Table 2 LSAR Data Tables Related to LSA Tasks
Table 3 Example of Cross-Mapping Records Held in Data
          Table XG
Table 4 Examples of LCN Group Elements Allocated in
          Data Table XB
Table 5 Examples of UOC/ALC Allocation in Data Table XC
Table 6 Examples of LCN to System End Item
Table 7 Examples of Implied UOC
Figure 1 The Complete Feedback Loop of LSA
Figure 2 LSA Process
Figure 3 Task Breakdown for Full Scale Development
           Project
Figure 4 Task Breakdown for First-of-Class Warship
           Project
Figure 5 Task Breakdown for Commercial-Off-The-Shelf
           Project
Figure 6 Task Breakdown for Non-Developmental Project
Figure 7 Tailoring Logic Diagram
Figure 8 Comparison of Functional and Physical Breakdowns
Figure 9 Functional LCN Breakdown
Figure 10 Physical LCN Breakdown
Figure 11 Functional LCN Assignment - Classical
Figure 12 Physical LCN Assignment - Classical
Figure 13 Physical LCN Assignment - Modified Classical
Figure 14 Functional LCN Cross-Mapping
Figure 15 Physical LCN Cross-Mapping
Figure 16 ALC Assignment for Single Configuration
           Equipment
Figure 17 ALC and UOC Allocation
Figure 18 Not Yet Issued
Figure 19 System Level Logistics Support Analysis
           Interfaces
Figure 20 LSAR Data Table Utilization by Equipment
           Breakdown
Figure 20 Feasibility Study Phase LSAR
Annex A Guidance for the Assignment of Logistic Control
          Number (LCN), Alternate LCN Code (ALC), LCN
          Type and Usable On Code (UOC)
Annex B Application Guidance for Implementation of LSA
          Programme Requirements
Annex C Application and Tailoring Guidance for the LSAR

Gives information and guidance for interpretation of LSA and LSAR requirements, to meet the overall objectives of the procurement and through life management of Defence equipment. It can apply equally to a contractor's or a customer's LSA and LSAR requirements.

DevelopmentNote
Supersedes DEFSTAN 00-60(PT2)/1(1994) (06/2003)
DocumentType
Standard
PublisherName
UK Ministry of Defence Standards
Status
Superseded
SupersededBy
Supersedes

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.