• Shopping Cart
    There are no items in your cart

DEFSTAN 00-60(PT2)/2(1998) : 1998

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

INTEGRATED LOGISTIC SUPPORT - GUIDE TO THE APPLICATION OF LSA AND LSAR

Superseded date

31-01-1999

Published date

12-01-2013

Sorry this product is not available in your region.

Preface
Section One. General
0 Introduction
1 Scope
2 Related Documents
3 Definitions
4 Abbreviations
5 LSA and LSAR
Section Two. Management
6 LSA and LSAR Management
Section Three. Application of LSA and LSAR to Projects
7 LSA Process
8 Tailoring
9 Data Transfer
Table 1 LSA Task Responsibilities
Table 2 LSA Subtasks Related to LSAR Data Production
Table 3 LSA Tasks/LSAR Table relationships - Feasibility
         (DI/NDI Only)
Table 4 LSA Tasks/LSAR Table relationships - Feasibility
         (COTS Only)
Table 5 LSA Tasks/LSAR Table relationships - Feasibility
         (GFE Only)
Table 6 LSA Tasks/LSAR Table relationships - Project
         Definition
Table 7 LSA Tasks/LSAR Table relationships - Full Scale
         Development
Table 8 LSA Tasks/LSAR Table relationships - Production
         (DI/NDI Only)
Table 9 LSA Tasks/LSAR table relationships - Production
         (DI/NDI Only)
Table 10 Example of Cross-Mapping Records Held in Data
         Table XG
Table 11 Examples of LCN Group Elements Allocated in Data
         Table XB
Table 12 Examples of UOC/ALC Allocation in Data Table XB
Table 13 Examples of LCN to system End Item
Table 14 Example of Implied UOC
Figure 1 The complete feedback loop of Logistic Support
          Analysis
Figure 2 LSA Process during equipment redesign
Figure 3 Task breakdown for full scale development project
Figure 4 Task breakdown for first-of-class warship project
Figure 5 Task breakdown for commercial-off-the-shelf project
Figure 6 Task breakdown for non-developmental project
Figure 7 Tailoring logic diagram
Figure 8 LSA programme planning, control and verification
          sub-task dependencies
Figure 9 LSA assessment and technical sub-task dependencies
Figure 10 Comparison of functional and physical breakdowns
Figure 11 Functional LCN breakdown
Figure 12 Physical LCN breakdown
Figure 13 Functional LCN assignment - classical
Figure 14 Physical LCN assignment - classical
Figure 15 Physical LCN assignment - modified classical
Figure 16 Functional LCN cross-mapping
Figure 17 Physical LCN cross-mapping
Figure 18 ALC Assignment for single configuration equipment
Figure 19 ALC and UOC Allocation
Figure 20 System level Logistics Support Analysis interfaces
Figure 21 LSAR Data table utilization by equipment breakdown
Figure 22 Feasibility study phase LSAR
Annex A Guidance for the Assignment of Logistic Control
          Number (LCN), Alternate LCN Code (ALC), LCN type
          and Usable On Code (UOC)
Annex B Application Guidance for Implementation of LSA
          Programme Requirements
Annex C Application and Tailoring Guidance for the LSAR

Gives guidance and information for interpretation of LSA and LSAR requirements, to meet overall objectives of the procurement and through life management of Defence equipment.

DevelopmentNote
Supersedes DEFSTAN 00-60(PT2)/1(1996) (06/2003)
DocumentType
Standard
PublisherName
UK Ministry of Defence Standards
Status
Superseded
SupersededBy
Supersedes

DEFSTAN 00-25(PT14)/1(2000) : 2000 HUMAN FACTORS FOR DESIGNERS OF EQUIPMENT - PART 14: MILITARY LAND VEHICLE DESIGN

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.