DEFSTAN 02-28/2(2014) : 2014
Current
The latest, up-to-date edition.
CONFIGURATION MANAGEMENT NUCLEAR SUBMARINES IN SERVICE REPORT
Hardcopy , PDF
English
24-07-2014
Foreword
0 Introduction
1 Scope
2 Warning
3 Normative References
4 Definitions
5 Abbreviations
6 Configuration Management
7 Configuration Identification and Baselines
8 Configuration Control
9 Configuration Audits
10 Concessions and Production Permits: General
11 Collection of Availability, Reliability and
Maintainability (ARM) Data
12 Defect Reporting
13 Interfaces (SDD Only)
14 Combat System Configuration Management
15 Nuclear Steam Raising Plant Configuration
Management
16 Strategic Weapon System and Support System
Configuration Management
17 The Design Information Services Group
18 The Submarine Definition Database
19 Technical Publications
20 Submarine Safety Registers (SRDB)
21 First Level Fitting Lists (FLFL) incorporating
First Level Area Diagrams (FLAD)
22 Maintaining the Configuration Status Record
(Ship Fit Definition)
23 Control and Validation during Upkeep Periods in
Fleet Time
24 Feedback of Change Information
25 Ship's Staff Feedback
26 Dockyard Feedback
27 New Build Platforms
Annex A - Definitions
Annex B - Abbreviations
Annex C - SEDIMC Interface Diagram
Annex D - List of SDD Configured Submarines Classes
and Shore Establishments
Annex E - Data Sources for Maintaining Configuration
and Datum Pack Baselines
Annex F - Reports Available form the SDD
Annex G - Definitions of an Alteration & Addition and Class
Modification to be Used for In-Service Submarines
Until Completion of the Design Change Management
Phased Improvement Plan
Annex H - Change Notices
Pertains to Submarine structure, systems and equipment for which In-service Submarines is the Duty Holder.
DevelopmentNote |
Supersedes DEFSTAN 02-28/1(2005). (08/2014)
|
DocumentType |
Standard
|
Pages |
40
|
PublisherName |
UK Ministry of Defence Standards
|
Status |
Current
|
Supersedes |
DEFSTAN 02-872(PT3)/2(2011) : 2011 | PROCEDURES FOR FIRST LEVEL NICKEL ALUMINIUM BRONZE CASTINGS - PART 3: REVALIDATION |
DEFSTAN 02-374/2(2009) : 2009 | RUBBER FLEXIBLE PIPES AND BELLOWS FOR USE IN SUBMARINES |
DEFSTAN 00-600/3(2014) : 2014 | INTEGRATED LOGISTIC SUPPORT - REQUIREMENTS FOR MOD PROJECTS |
DEFSTAN 02-38/2(2011) : 2011 | REQUIREMENTS FOR THE PREPARATION, IDENTIFICATION AND MANAGEMENT OF DATUM PACK DRAWINGS AND PHOTOGRAPHS FOR SWIFTSURE, TRAFALGAR & VANGUARD CLASS NUCLEAR SUBMARINES |
DEFSTAN 05-61(PT1)/5(2010) : 2010 | QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 1: CONCESSIONS |
DEFSTAN 05-57/6(2014) : 2014 | CONFIGURATION MANAGEMENT OF DEFENCE MATERIEL |
DEFSTAN 02-41/3(2012) : 2012 | REQUIREMENTS FOR CONFIGURATION MANAGEMENT OF SURFACE SHIPS |
DEFSTAN 21-13(PT3)/1(2000) : 2000 | COMBAT SYSTEM INTERFACE AND LINK DOCUMENTATION - PART 3: LINK DOCUMENT GUIDE |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.