DEFSTAN 05-123(PT1)/2(2004) : 2004
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
TECHNICAL PROCEDURES FOR THE PROCUREMENT OF AIRCRAFT, WEAPONS AND ELECTRONIC SYSTEMS - PART 1: APPROVAL PROCEDURE AND RESPONSIBILITIES
Hardcopy , PDF
25-07-2022
English
01-01-2004
Introduction
SECTION 0 GENERAL REQUIREMENTS
1 Scope
2 Warning
3 Normative References
4 Definitions
5 Abbreviations
SECTION 1 DESIGN APPROVED ORGANISATIONS SCHEME
6 Design Approved Organisations Scheme
6.1 General
6.2 Approvals
6.3 Application For Inclusion In The Scheme
6.4 Design Organisations
6.5 Conditions Of The Scheme
6.6 List Of Contractors In The Design Approved
Organisations Scheme
SECTION 2 DESIGN AND DEVELOPMENT
7 Responsibility For Design And Development
7.1 General
7.2 Responsibilities Of A Contractor
7.3 Sub-Contractors
7.4 Designs Using Government Furnished Assets
7.5 Relationship Between The Contractor And MOD
SECTION 3 CERTIFICATION OF DESIGN
8 Certification Of Design
8.1 General
8.2 Requirements
8.3 Submission And Acceptance
APPENDIX A PARTICULAR REQUIREMENTS FOR AIRCRAFT
ANNEX A1 CERTIFICATE OF DESIGN FOR AIRCRAFT
ANNEX A2 CERTIFICATE OF DESIGN FOR USE BY ORGANISATIONS
APPROVED FOR THE DESIGN OF MODIFICATIONS AND
SPECIAL INSTALLATIONS IN AIRCRAFT
APPENDIX B PARTICULAR REQUIREMENTS FOR COMPONENTS, EQUIPMENT
OR SYSTEMS
ANNEX B1 CERTIFICATE OF DESIGN FOR A COMPONENT/EQUIPMENT/SYSTEM
APPENDIX C PARTICULAR REQUIREMENTS FOR GUIDED WEAPONS
ANNEX C1 CERTIFICATE OF DESIGN FOR GUIDED WEAPONS
SECTION 4 MATERIAL SPECIFICATION
9 Contractor's Material Specifications (Withdrawn)
SECTION 5 REQUALIFICATION AND PRODUCTION TESTING
10 The Requalification And Subsequent Production Testing Of
Components And Equipment
10.1 Introduction
10.2 General
10.3 Requirements Applicable to The Circumstances Defined
At Clauses 10.1.3 a. and 10.1.3 b. Above
10.4 Requirements When The MOD Changes Manufacturer
(Clause 10.1.3 C. Above)
10.5 Special Arrangements For Materiel Containing Explosives
SECTION 6 AIRCRAFT CONTRACTORS RESPONSIBILITIES
11 Additional Responsibilities Of Aircraft Contractors For
Development Of Aircraft Systems, Equipment And Installations
11.1 General
11.2 Proposals For Equipment Development
11.3 Interface Requirements
11.4 Design Of Particular Systems And Equipment Installation
SECTION 7 AIRCRAFT REPAIR SCHEMES
12 Approval Of Aircraft Repair Schemes
12.1 General
12.2 Service Approved Repair Scheme
12.3 Design Organisation Repair Schemes
Specifies the responsibilities of contractors and contains the technical procedures for the establishment and maintenance of airworthiness. Matters relating to the safety of guided weapons are also dealt with.
DevelopmentNote |
Supersedes DEFSTAN 05-123/1(1983). (11/2004) This standard is obsolescent because it is no longer required for procurement of new equipment but is retained for maintenance purposes in support of existing in-service equipment. (10/2011)
|
DocumentType |
Standard
|
Pages |
38
|
PublisherName |
UK Ministry of Defence Standards
|
Status |
Withdrawn
|
Supersedes |
DEFSTAN 05-100/4(2009) : 2009 | MINISTRY OF DEFENCE REQUIREMENTS FOR AIRCRAFT FLIGHT AND GROUND RUNNING |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.