• DEFSTAN 05-61(PT11)/2(1992) : 1992

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 11: PROOF SENTENCING

    Available format(s):  Hardcopy, PDF

    Superseded date:  20-05-2005

    Language(s):  English

    Published date:  01-01-1992

    Publisher:  UK Ministry of Defence Standards

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    PREFACE
    0 Introduction
    1 Scope
    2 Related Documents
    3 Requirements

    Abstract - (Show below) - (Hide below)

    Gives the requirements for the conducting of proof sentencing by the Contractor.

    General Product Information - (Show below) - (Hide below)

    Development Note Supersedes DEFSTAN 05-61(PT11)/1(1985) (07/2003) This standard is obsolescent because it is no longer required for the procurement of new equipment but is retained for maintenance purposes in support of existing in-service equipment. (09/2007)
    Document Type Standard
    Publisher UK Ministry of Defence Standards
    Status Superseded
    Superseded By
    Supersedes

    Standards Referenced By This Book - (Show below) - (Hide below)

    DEFSTAN 05-61(PT17)/1(1992) : 1992 QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 17: PROOF OF EXPLOSIVE OPERATED DEVICES THAT DISCHARGE PROJECTILES
    DEFSTAN 13-92/3(1996) : 1996 MANUFACTURE, INSPECTION AND PROOF OF ORDNANCE OF 20 MM CALIBRE AND OVER
    DEFSTAN 05-61(PT14)/1(1994) : 1994 QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 14: PROOF SCHEDULES FOR CONVENTIONAL WEAPONS, AMMUNITION AND EXPLOSIVE ITEMS OF NEW MANUFACTURE

    Standards Referencing This Book - (Show below) - (Hide below)

    DEFSTAN 05-61(PT1)/3(1998) : 1998 QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 1: DEVIATION/PRODUCTION PERMITS AND WAIVERS/CONCESSIONS - QUALITY ASSURANCE OF SUBCONTRACT WORK
    DEFSTAN 05-62(PT17)/1(1987) : 1987 GUIDANCE ON QUALITY ASSURANCE PROCEDURES - PART 17: GUIDANCE ON THE PREPARATION OF PROOF SCHEDULES FOR THE PROOF OF CONVENTIONAL WEAPONS, AMMUNITION AND EXPLOSIVE ITEMS OF NEW MANUFACTURE
    DEFSTAN 13-92/3(1996) : 1996 MANUFACTURE, INSPECTION AND PROOF OF ORDNANCE OF 20 MM CALIBRE AND OVER
    DEFSTAN 05-61(PT3)/1(1983) : 1983 AMD 1 1996 QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 3: QUALITY ASSURANCE OF SUB-CONTRACT WORK
    DEFSTAN 13-96(PT1)/3(1994) : 1994 LOTTING AND BATCHING OF AMMUNITION - PART 1: GENERAL REQUIREMENTS
    DEFSTAN 13-96(PT2)/5(1999) : 1999 LOTTING AND BATCHING OF AMMUNITION - PART 2: LAND SERVICE AMMUNITION
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective