DEFSTAN 23-13(PT2)/1(2014) : 2014
Superseded
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
GENERIC BASE ARCHITECTURE (GBA) - PART 2: POWER
Available format(s)
Hardcopy , PDF
Language(s)
English
Published date
01-01-2014
Publisher
Superseded date
27-02-2023
Superseded by
€13.62
Excluding VAT
Foreword
Introduction
1 Scope
2 Warning
3 Normative References
4 Definitions
5 Abbreviations
6 Base Electrical Infrastructure
Annex A - Complete Base Power Infrastructure
Requirements
Annex B - Glossary
Defines the standards for the power, water, waste and fuel infrastructure in an operational base or headquarters and for the interfaces to it.
| DevelopmentNote |
Supersedes DEFSTAN 23-13/1(2012). (10/2014)
|
| DocumentType |
Standard
|
| Pages |
50
|
| PublisherName |
UK Ministry of Defence Standards
|
| Status |
Superseded
|
| SupersededBy | |
| Supersedes |
| BS 7671(2008) : 2008 | REQUIREMENTS FOR ELECTRICAL INSTALLATIONS - IET WIRING REGULATIONS |
| DEFSTAN 61-17/5(2009) : 2009 | THE SELECTION AND INTRODUCTION OF BATTERIES AND FUEL CELLS FOR SERVICE USE |
| DEFSTAN 00-35/2(1996) : 1996 AMD 1 1997 | ENVIRONMENTAL HANDBOOK FOR DEFENCE MATERIEL |
Summarise