• There are no items in your cart

DEFSTAN 59-41(PT3)SUPPC/2(1994) : 1994

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

ELECTROMAGNETIC COMPATIBILITY - TECHNICAL REQUIREMENTS, TEST METHODS AND LIMITS - TEST METHOD DCE03 EXPORTED TRANSIENTS POWER LINES

Superseded date

06-10-1995

Published date

12-01-2013

Measures the amplitude and duration of transients appearing on power lines caused by the normal operation of the EUT and also as a result of switching on and off the power supply to the EUT. Applies to the AC and DC power cables that interface with bus bars.

DevelopmentNote
Supersedes DEFSTAN 59-41(PT3)SUPPC/1(1993) (08/2003)
DocumentType
Standard
PublisherName
UK Ministry of Defence Standards
Status
Superseded
SupersededBy
Supersedes

Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.