DEFSTAN 59-41(PT3)SUPPM/5(1995) : 1995
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
ELECTROMAGNETIC COMPATIBILITY - PART 3: TECHNICAL REQUIREMENTS TEST METHODS AND LIMITS - SUPPLEMENT M: TEST METHOD DCS06 IMPORTED LONG TRANSIENTS SUSCEPTIBILITY (LAND SERVICE) AC AND DC SYSTEMS
Hardcopy , PDF
16-05-2003
English
01-01-1995
Preface
1 Purpose
2 WARNING
3 Applicability
4 Test Layout
5 Test Method
6 Limits
Certifies that transients typical of those produced by Group Switching of equipments on the power supply lines will not damage the EUT.
DevelopmentNote |
Supersedes DEFSTAN 59-41(PT3)SUPPM/2(1994) & DEFSTAN 59-41(PT3)SUPPM/1(1993) (08/2003)
|
DocumentType |
Standard
|
Pages |
10
|
PublisherName |
UK Ministry of Defence Standards
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.