DI-MGMT-81398 Revision C:2014
Current
The latest, up-to-date edition.
Hazardous Materials Management Program (HMMP) Plan
English
19-06-2014
Specifies the contractor's plan to influence the reduction of hazardous material (HAZMAT) risks, associated with a system, to acceptable levels to protect human health and the environment during the system planning and design processes.
| DevelopmentNote |
NEW CHILD NOT 1 IS ADDED
|
| DocumentType |
Standard
|
| Pages |
3
|
| ProductNote |
NEW CHILD NOT 1 IS ADDED
|
| PublisherName |
US Military Specs/Standards/Handbooks
|
| Status |
Current
|
The Hazardous Materials Management Program (HMMP) Plan influences the reduction of Hazardous Material (HAZMAT) in the system and that is used for operation and maintenance of the system. The plan also influences the reduction of HAZMAT risk associated with a system to acceptable levels to protect personnel, equipment, property, and the environment during the system planning, design, and sustainment processes. The plan considers the current phase and all future phases of the system’s life cycle.
| GEIASTD0007B:2013 | LOGISTICS PRODUCT DATA |
| MIL-STD-882 Revision E:2012 | System Safety |
| GEIA HB 0007 : 2010 | LOGISTICS PRODUCT DATA HANDBOOK |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.