• Shopping Cart
    There are no items in your cart

DIN 18301:2019-09

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

View Superseded by

German construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV) - Drilling works

Available format(s)

Hardcopy , PDF

Withdrawn date

02-09-2023

Superseded by

DIN 18301:2023-09

Language(s)

German, English

Published date

01-09-2019

€57.57
Excluding VAT

This standard deals with the drilling of holes, irrespective of their type, depth or heading (orientation), in particular for  geotechnical investigation and testing of ground and groundwater, water extraction and discharge, ground water lowering, drainage, degasification and geothermal exploration,  grouting (including jet grouting), constructing bored or grouted piles, constructing contiguous bored pile walls, including those for supporting and sealing,  installing anchorages, other structural elements, borehole heat exchangers and measuring equipment,  drilling work for the purposes of maintaining, repairing and decommissioning wells, ground water measuring stations and borehole heat exchangers, and for backfilling abandoned boreholes,  for drilling work to loosen the ground, for removal of obstructions or soil exchange.

DocumentType
Standard
Pages
18
PublisherName
German Institute for Standardisation (Deutsches Institut für Normung)
Status
Withdrawn
SupersededBy
Supersedes

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.