DIN 4123:1972-05
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
EXCAVATION, FOUNDATION AND UNDERPINNING WORK ADJACENT TO EXISTING BUILDINGS
Hardcopy , PDF
07-03-2021
English
01-01-1972
Foreword
1 Scope
2 Normative references
3 Concept
4 Documentation
5 Site management
6 Work preparatory to planning and execution
6.1 Investigations prior to beginning work
6.2 Ground exploration
6.3 Investigation of existing buildings
6.4 Investigation of ground forces
6.5 Securing the existing building
7 Excavations
7.1 General
7.2 Limits of excavation
7.3 Excavations in sections
7.4 Weather protection of excavation pit
7.5 Monitoring of existing building
8 Foundations
8.1 General
8.2 Foundation depth
8.3 Trenches and shafts
8.4 Foundations for new structure
8.5 Settlement
8.6 Monitoring of existing building
9 Underpinnings
9.1 General
9.2 Foundation depth
9.3 Building materials and products
9.4 Wall thickness
9.5 Trenches and shafts
9.6 Underpinning wall
9.7 Connection of underpinning to foundation
9.8 Foundations for new structure
9.9 Monitoring of existing building
10 Stability analysis
10.1 Stability analysis of existing building
10.2 Stability analysis for excavation, foundation and
underpinning work
10.3 Stability analysis of underpinning wall
Applies to excavations and foundation work in non-cohesive and cohesive soils near existing buildings.
DevelopmentNote |
Suspended until publication of a revised English text, due to a new German edition. (05/2011)
|
DocumentType |
Standard
|
Pages |
6
|
PublisherName |
German Institute for Standardisation (Deutsches Institut für Normung)
|
Status |
Superseded
|
DIN V 105-1:2002-06 | CLAY MASONRY UNITS - PART 1: SOLID UNITS AND VERTICALLY PERFORATED UNITS OF BULK DENSITY CLASSES >= 1.2 |
DIN 4017-2 E : 1979 | SUBSOIL; SHEAR FAILURE CALCULATIONS FOR SHALLOW FOUNDATIONS WITH OBLIQUE AND ECCENTRIC LOADING |
DIN 18127:1997-11 | SOIL - INVESTIGATION AND TESTING - PROCTOR-TEST |
DIN EN 1537:2001-01 | EXECUTION OF SPECIAL GEOTECHNICAL WORKS - GROUND ANCHORS |
DIN 4094:1990-12 | SOIL; EXPLORATION BY PENETRATION TESTS |
DIN 4022-1 E : 1987 | SUBSOIL AND GROUNDWATER - CLASSIFICATION AND DESCRIPTION OF SOIL AND ROCK - BOREHOLE LOGGING OF SOIL AND ROCK NOT INVOLVING CONTINUOUS CORE SAMPLE RECOVERY |
DIN 4107 E : 1978 | SUBSOIL; SETTLEMENT OBSERVATIONS DURING AND AFTER CONSTRUCTION OF STRUCTURES |
DIN V 106-1:2003-02 | CALCIUM SILICATE UNITS - PART 1: SOLID UNITS, PERFORATED UNITS, SOLID BLOCKS, PERFORATED BLOCKS, HIGH PRECISION UNITS, HIGH PRECISION ELEMENTS, CHAMFERED UNITS, SLABS, SHAPED UNITS |
DIN 4017-1 E : 1979 | SUBSOIL; SHEAR FAILURE CALCULATIONS FOR SHALLOW FOUNDATIONS WITH VERTICAL AND CENTRAL LOADING |
DIN 4021:1990-10 | SOIL; EXPLORATION BY EXCAVATION AND BORINGS; SAMPLING |
DIN 4022-1:1987-09 | SUBSOIL AND GROUNDWATER - CLASSIFICATION AND DESCRIPTION OF SOIL AND ROCK - BOREHOLE LOGGING OF SOIL AND ROCK NOT INVOLVING CONTINUOUS CORE SAMPLE RECOVERY |
DIN 4021 E : 1990 | SOIL; EXPLORATION BY EXCAVATION AND BORINGS; SAMPLING |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.