DIN 52171:1942-07
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
PROPORTION OF THE CONSTITUENTS AND THE MIXING RATIO OF FRESH MORTAR AND FRESH CONCRETE
Hardcopy , PDF
01-01-1997
English
12-01-2013
The terms fresh mortar and fresh concrete are contrasted with hardened mortar and hardened concrete. They are defined as the mortar and concrete mix, that is to say, the unprocessed or processed mortar and concrete which has not yet hardened.
DocumentType |
Standard
|
Pages |
2
|
PublisherName |
German Institute for Standardisation (Deutsches Institut für Normung)
|
Status |
Withdrawn
|
DIN 1084-1 E : 1978 | CONTROL (QUALITY CONTROL) OF CONCRETE STRUCTURES AND REINFORCED CONCRETE STRUCTURES - CONCRETE B 2 ON BUILDING SITES |
DIN 1048-1:1991-06 | TESTING CONCRETE - TESTING OF FRESH CONCRETE |
DIN 1084-2:1978-12 | CONTROL (QUALITY CONTROL) OF CONCRETE STRUCTURES AND REINFORCED CONCRETE STRUCTURES - PRECAST COMPONENTS |
DIN 1084-3:1978-12 | CONTROL (QUALITY CONTROL) OF CONCRETE STRUCTURES AND REINFORCED CONCRETE STRUCTURES - READY-MIXED CONCRETE |
DIN 1084-1:1978-12 | CONTROL (QUALITY CONTROL) OF CONCRETE STRUCTURES AND REINFORCED CONCRETE STRUCTURES - CONCRETE B 2 ON BUILDING SITES |
DIN 1084-3 E : 1978 | CONTROL (QUALITY CONTROL) OF CONCRETE STRUCTURES AND REINFORCED CONCRETE STRUCTURES - READY-MIXED CONCRETE |
DIN 1084-2 E : 1978 | CONTROL (QUALITY CONTROL) OF CONCRETE STRUCTURES AND REINFORCED CONCRETE STRUCTURES - PRECAST COMPONENTS |
DIN 52170-1:1980-02 | Determination of composition of hardened concrete; general, terms, sampling, dry-bulk density |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.