DIN EN 13231-2 E : 2006
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
RAILWAY APPLICATIONS - TRACK - ACCEPTANCE OF WORKS - PART 2: WORKS ON BALLASTED TRACK - SWITCHES AND CROSSINGS
01-07-2013
12-01-2013
Foreword<br>1 Scope<br>2 Normative references<br>3 Terms and definitions<br>4 Acceptance of works on switches and crossings<br> 4.1 General<br> 4.2 Acceptance deadlines<br> 4.3 Acceptance measurements and checks<br> 4.4 Acceptance documents<br> 4.5 Relative track geometry<br> 4.5.1 Tolerances<br> 4.5.2 Parameters<br> 4.6 Absolute track position<br> 4.6.1 Tolerances for absolute vertical position of <br> the track<br> 4.6.2 Tolerances for absolute lateral position of <br> the track<br> 4.7 Other parameters and verifications<br> 4.7.1 Check rail to check rail gauge<br> 4.7.2 Squareness of switches<br> 4.7.3 Longitudinal relationship of switch tip to stock <br> rail<br> 4.7.4 Longitudinal position of the switch and crossing <br> to the design position<br> 4.7.5 Absolute vertical position of the switch and <br> crossing layout<br> 4.7.6 Absolute lateral position of the switch and <br> crossing layout<br> 4.7.7 Check of the lead offsets<br> 4.7.8 Bearer position<br> 4.7.9 Voiding of bearers<br> 4.7.10 Fasteners<br> 4.7.11 Welds<br> 4.7.12 Fishplated joints<br> 4.7.13 Insulated joints<br> 4.7.14 Functional check<br> 4.7.15 Expansion devices<br> 4.8 Acceptance responsibilities and acceptance form<br> 4.9 Warranty<br>Annex A (informative) Acceptance responsibilities<br>Annex B (informative) Example of an acceptance form
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.