• DIN EN 13232-7:2014-07 (Draft)

    Withdrawn A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

    RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 7: CROSSINGS WITH MOVEABLE PARTS

    Available format(s):  Hardcopy, PDF

    Withdrawn date:  07-03-2021

    Language(s):  German

    Published date:  01-01-2014

    Publisher:  German Institute for Standardisation (Deutsches Institut für Normung)

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    Foreword
    Introduction
    1 Scope
    2 Normative references
    3 Types of crossing with moveable parts
      3.1 Common crossings with moveable parts
      3.2 Obtuse crossings with moveable parts
      3.3 Materials
      3.4 Geometry
      3.5 Inclination of the running table
      3.6 Construction
      3.7 Relationship with the adjacent track
    4 Terms and definitions
      4.1 Common crossing with moveable point
      4.2 Common crossing with moveable wing rails
      4.3 Obtuse crossing with moveable parts
    5 Design requirements
      5.1 Geometrical data
      5.2 Rolling stock data
          5.2.1 Maximum axle load
          5.2.2 Maximum speed
          5.2.3 Wheel profile, diameter, back to back and wheel
                set dimensions
          5.2.4 Note
      5.3 Supports and fastenings
      5.4 Interface between crossing with moveable parts and
          operating system
      5.5 Transfer of longitudinal track forces
      5.6 Other requirements
      5.7 Drawings
    6 Tolerances and inspection
      6.1 General
      6.2 Tools and instruments
      6.3 Critical dimensions
          6.3.1 General
          6.3.2 Critical dimensions for common crossings with
                moveable point
          6.3.3 Critical dimensions for common crossings with
                moveable wing rails
          6.3.4 Critical dimensions for obtuse crossings with
                moveable parts
      6.4 Certification
      6.5 Methods of examination for structural defects
          6.5.1 Visual
          6.5.2 Dye penetrant and/or magnetic particle
          6.5.3 Ultrasound
          6.5.4 Radiography
    7 Limits and extent of supply
    8 Identification marks
    Annex ZA (informative) Relationship between this European
                           Standard and the Essential Requirements
                           of EU Directive 96/48/EC of 23 July 1996
                           on the interoperability of the
                           trans-European high-speed rail system
                           amended by Directive 2004/50/EC of 29
                           April 2004
    Bibliography

    Abstract - (Show below) - (Hide below)

    Establishes a working terminology for crossings with moveable parts, which means crossings with moveable parts to close the gap of the running edge, and their constituent parts, and identify the main types. Lists the minimum informative requirements for the manufacture of crossings with moveable parts and/or their constituent parts.

    General Product Information - (Show below) - (Hide below)

    Comment Closes On
    Development Note DRAFT 2014 issued in July 2014 is now cancelled. (01/2017)
    Document Type Draft
    Publisher German Institute for Standardisation (Deutsches Institut für Normung)
    Status Withdrawn

    Standards Referencing This Book - (Show below) - (Hide below)

    EN 13232-2:2003+A1:2011 Railway applications - Track - Switches and crossings - Part 2: Requirements for geometric design
    EN 13674-4:2006+A1:2009 RAILWAY APPLICATIONS - TRACK - RAIL - PART 4: VIGNOLE RAILWAY RAILS FROM 27 KG/M TO, BUT EXCLUDING 46 KG/M
    EN 13232-3:2003+A1:2011 Railway applications - Track - Switches and crossings - Part 3: Requirements for wheel/rail interaction
    EN 13145:2001+A1:2011 Railway applications - Track - Wood sleepers and bearers
    UIC 866 : 2ED 1985 TECHNICAL SPECIFICATION FOR THE SUPPLY OF CAST MANGANESE STEEL CROSSINGS FOR SWITCH AND CROSSING WORK
    PREN 13232-9 : DRAFT 2014 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 9: LAYOUTS
    EN 13232-4:2005+A1:2011 Railway applications - Track - Switches and crossings - Part 4: Actuation, locking and detection
    EN 13674-2:2006+A1:2010 Railway applications - Track - Rail - Part 2: Switch and crossing rails used in conjunction with Vignole railway rails 46 kg/m and above
    EN 13674-1:2011+A1:2017 Railway applications - Track - Rail - Part 1: Vignole railway rails 46 kg/m and above
    EN 13232-1:2003 Railway applications - Track - Switches and crossings - Part 1: Definitions
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective