• DIN EN 13232-9:2014-07 (Draft)

    Withdrawn A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

    RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 9: LAYOUTS

    Available format(s):  Hardcopy, PDF

    Withdrawn date:  07-03-2021

    Language(s):  German

    Published date:  01-01-2014

    Publisher:  German Institute for Standardisation (Deutsches Institut für Normung)

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    Foreword
    1 Scope
    2 Normative references
    3 Terms and definitions
    4 General design process
      4.1 General process
      4.2 Design step details
      4.3 Practical use of the design process
    5 General design (design step 1)
      5.1 Track layout
      5.2 Geometrical design
          5.2.1 Inputs
          5.2.2 Rules
          5.2.3 Geometry plan
      5.3 Wheel rail interaction
          5.3.1 Inputs
          5.3.2 Rules
          5.3.3 Output
    6 Main constructional design (step 2)
      6.1 Inputs
      6.2 Structural requirements
          6.2.1 General
          6.2.2 General requirements
          6.2.3 Specific requirements
          6.2.4 Other requirements
      6.3 Actuation, locking and detection design
      6.4 Output - main construction documents
          6.4.1 Geometry
          6.4.2 Guidance
          6.4.3 Actuation
          6.4.4 Constructional
          6.4.5 Information lists
    7 Detailed component design (step 3)
      7.1 Switches
      7.2 Crossings
      7.3 Expansion devices
      7.4 Other components
      7.5 Output - assembly documents
          7.5.1 Main assembly documents
          7.5.2 Optional documents
    8 Acceptance (step 4)
      8.1 Inputs
          8.1.1 Documents and plans
          8.1.2 Limits of supply
      8.2 Acceptance testing
          8.2.1 Components acceptance
          8.2.2 Layout assembly acceptance
      8.3 Outputs
          8.3.1 Documents
          8.3.2 Traceability
          8.3.3 Markings
    Annex A (informative) Design criteria
          A.1 Geometry design
          A.2 Wheel rail interaction
          A.3 Actuation, locking and detection conformity
          A.4 Switch design
          A.5 Crossing design (with fixed parts)
          A.6 Crossing design (with moveable parts)
          A.7 Expansion devices
    Annex B (informative) Layout acceptance form
          B.1 Justification
          B.2 Example of layout acceptance form
    Annex C (informative) Functional and safety dimensions, practically
                           used by different European Networks
    Annex D (normative) Maximum angle of attack in obtuse crossings
    Annex ZA (informative) Relationship between this European
                           Standard and the Essential Requirements
                           of EU Directive 96/48/EC of 23 July 1996
                           on the interoperability of the trans-European
                           high-speed rail system amended by Directive
                           2004/50/EC of 29 April 2004
    Bibliography

    Abstract - (Show below) - (Hide below)

    Defines - the design process of switches and crossings, and the use of the other parts of this standard; - the main criteria to be taken into account during the design of the layout, including the safety and functional dimensions as well as geometrical and material aspects; - the main criteria to be verified during the design approval; - the geometrical and non-geometrical acceptance criteria for inspection of layouts assembled both in the fabrication plant and at track site in case of layouts that are delivered non or partially assembled or in a 'kit' form; - to determine the limits of supply; - the minimum requirements for traceability.

    General Product Information - (Show below) - (Hide below)

    Comment Closes On
    Development Note DRAFT 2014 issued in July 2014 is now cancelled. (01/2017)
    Document Type Draft
    Publisher German Institute for Standardisation (Deutsches Institut für Normung)
    Status Withdrawn

    Standards Referencing This Book - (Show below) - (Hide below)

    UIC C70 RP 1 : 1969 ASSESSMENT CRITERIA FOR THE PERMISSIBLE WEAR PROFILES OF WHEEL FLANGES AND SWITCH COMPONENTS (FINAL REPORT)
    EN 13232-2:2003+A1:2011 Railway applications - Track - Switches and crossings - Part 2: Requirements for geometric design
    EN 13674-3:2006+A1:2010 Railway applications - Track - Rail - Part 3: Check rails
    EN 13674-4:2006+A1:2009 RAILWAY APPLICATIONS - TRACK - RAIL - PART 4: VIGNOLE RAILWAY RAILS FROM 27 KG/M TO, BUT EXCLUDING 46 KG/M
    EN 13230-4:2016 Railway applications - Track - Concrete sleepers and bearers - Part 4: Prestressed bearers for switches and crossings
    EN 13715:2006+A1:2010 Railway applications - Wheelsets and bogies - Wheels - Tread profile
    EN 13232-3:2003+A1:2011 Railway applications - Track - Switches and crossings - Part 3: Requirements for wheel/rail interaction
    UIC 510-2 : 4ED 2004 TRAILING STOCK: WHEELS AND WHEELSETS - CONDITIONS CONCERNING THE USE OF WHEELS OF VARIOUS DIAMETERS
    UIC 505-1 : 10ED 2006 RAILWAY TRANSPORT STOCK - ROLLING STOCK CONSTRUCTION GAUGE
    EN 13232-5:2005+A1:2011 Railway applications - Track - Switches and crossings - Part 5: Switches
    EN 13145:2001+A1:2011 Railway applications - Track - Wood sleepers and bearers
    UIC 711 : 1ED 1981 GEOMETRY OF POINTS AND CROSSINGS WITH UIC RAILS PERMITTING SPEEDS OF 100 KM/H OR MORE ON THE DIVERGING TRACK
    PREN 13232-8 : DRAFT 2014 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 8: EXPANSION DEVICES
    EN 13232-7:2006+A1:2011 Railway applications - Track - Switches and crossings - Part 7: Crossings with moveable parts
    EN 13232-6:2005+A1:2011 Railway applications - Track - Switches and crossings - Part 6: Fixed common and obtuse crossings
    UIC 716 : 2ED 2004 MAXIMUM PERMISSIBLE WEAR PROFILES FOR SWITCHES
    EN 13232-4:2005+A1:2011 Railway applications - Track - Switches and crossings - Part 4: Actuation, locking and detection
    EN 13674-2:2006+A1:2010 Railway applications - Track - Rail - Part 2: Switch and crossing rails used in conjunction with Vignole railway rails 46 kg/m and above
    EN 13674-1:2011+A1:2017 Railway applications - Track - Rail - Part 1: Vignole railway rails 46 kg/m and above
    EN 13232-1:2003 Railway applications - Track - Switches and crossings - Part 1: Definitions
    UIC 505-4 : 4ED 2007 EFFECTS OF THE APPLICATION OF THE KINEMATIC GAUGES DEFINED IN THE 505 SERIES OF LEAFLETS ON THE POSITIONING OF STRUCTURES IN RELATION TO THE TRACKS AND OF THE TRACKS IN RELATION TO EACH OTHER
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective