Foreword
Introduction
1 Scope
2 Conformance
2.1 Dual citing of normative references
2.2 Units of measurement
3 Normative references
4 Terms, definitions, symbols and abbreviated
terms
4.1 Terms and definitions
4.2 Symbols and abbreviated terms
5 Information to be supplied when placing
orders for drill-pipe
6 Requirements for drill-pipe
6.1 General
6.2 Dimensions, masses and connections
6.3 Material requirements
6.4 Process of manufacture for drill-pipe
6.5 Traceability
6.6 Inspection and testing - General
6.7 Testing of welds
6.8 Tensile test
6.9 Hardness test
6.10 Charpy V-notch impact test
6.11 Transverse side-bend test
6.12 Imperfections and defects in drill-pipe
6.13 Visual inspection of the drill-pipe weld zone
6.14 Non-destructive examination of the weld zone
6.15 Marking of drill-pipe
6.16 Minimum facility requirements for drill-pipe
manufacturers
6.17 Documentation requirements of drill-pipe
7 Requirements for drill-pipe body
7.1 Information to be supplied when placing
orders for drill-pipe bodies
7.2 Dimensional and mass requirements
7.3 Material requirements
7.4 Process of manufacture
7.5 Traceability
7.6 Inspection and testing - General
7.7 Testing of chemical composition
7.8 Tensile tests
7.9 Charpy V-notch impact tests
7.10 Drill-pipe-body wall thickness
7.11 Drill-pipe-body length
7.12 Internal upset
7.13 Internal profile
7.14 Straightness
7.15 Upset alignment
7.16 Mass determination
7.17 Imperfections and defects of drill-pipe body
7.18 Visual inspection of drill-pipe body
7.19 Non-destructive examination
7.20 Marking
7.21 Minimum facility requirements for
drill-pipe-body manufacturer
7.22 Documentation requirements
8 Requirements for tool joints
8.1 Information to be supplied when
placing orders for tool joints
8.2 Dimensional requirements
8.3 Material requirements
8.4 Process of manufacture
8.5 Traceability
8.6 Inspection and testing - General
8.7 Testing of chemical composition
8.8 Tensile tests
8.9 Hardness tests
8.10 Charpy V-notch impact tests
8.11 Imperfections and defects
8.12 Non-destructive examination
8.13 Marking
8.14 Minimum facility requirements
for tool-joint manufacturers
8.15 Documentation requirements for tool joints
Annex A (normative) Tables in SI units
Annex B (normative) Figures in SI (USC) units
Annex C (normative) Tables in USC units
Annex D (normative) Purchaser inspection
Annex E (informative) Supplementary requirements
Annex F (informative) Procedures used to convert
from USC units to SI units for drill-pipe
Annex G (normative) Product specification levels
Annex H (informative) API monogram
Bibliography