DVGW GW 304 : 2008
Current
Current
The latest, up-to-date edition.
Sorry this product is not available in your region.
| DevelopmentNote |
SUPP 1 is available separately; see DVGW GW 304 SUPP 1. (03/2012)
|
| DocumentType |
Standard
|
| PublisherName |
Wirtschafts und Verlagsgesellschaft Gas und Wasser
|
| Status |
Current
|
| 17/30341312 DC : 0 | BS EN ISO 21225-1 - PLASTICS PIPING SYSTEMS FOR THE TRENCHLESS REPLACEMENT OF UNDERGROUND PIPELINE NETWORKS - PART 1: REPLACEMENT ON THE LINE BY PIPE BURSTING AND PIPE EXTRACTION |
| DIN 19630:1982-08 | GUIDELINES FOR THE CONSTRUCTION OF WATER PIPELINES - DVGW CODE OF PRACTICE |
| DIN 18319:2016-09 | GERMAN CONSTRUCTION CONTRACT PROCEDURES (VOB) - PART C: GENERAL TECHNICAL SPECIFICATIONS IN CONSTRUCTION CONTRACTS (ATV) - TRENCHLESS PIPELAYING |
| 17/30341315 DC : 0 | BS EN ISO 21225-2 - PLASTICS PIPING SYSTEMS FOR THE TRENCHLESS REPLACEMENT OF UNDERGROUND PIPELINE NETWORKS - PART 2: REPLACEMENT OFF THE LINE BY HORIZONTAL DIRECTIONAL DRILLING AND IMPACT MOLING |
| ISO 21225-1:2018 | Plastics piping systems for the trenchless replacement of underground pipeline networks — Part 1: Replacement on the line by pipe bursting and pipe extraction |
Summarise
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.
Sorry this product is not available in your region.