EI MODEL CODE SAFE PRACTICE PT17 VOL.1 : 1ED 2009
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
MODEL CODE OF SAFE PRACTICE IN THE PETROLEUM INDUSTRY - PART 17: VOLUME 1: HIGH PRESSURE AND HIGH TEMPERATURE (HPHT) WELL PLANNING
24-05-2022
01-04-2009
Acknowledgements
Foreword
1 Introduction
2 HPHT project risk and uncertainty management
3 Well objectives
4 Project risk
5 Well planning good practice
6 Rig selection
7 Safety planning for operations
8 Further safety related technical issues
9 Suggested further reading and references
Annex A - Specifications
Annex B - Managed pressure drilling and fluid engineering
Annex C - Glossary of terms and abbreviations
Specifies details on project risk and uncertainty management, roles and responsibilities, project management framework, quality assurance and quality control, well planning good practice, rig selection and planning for safety operations.
DevelopmentNote |
Also available as a SET along with VOL 2 & VOL 3. (06/2009)
|
DocumentType |
Standard
|
PublisherName |
Energy Institute (formerly Institute of Petroleum - IP)
|
Status |
Withdrawn
|
BS EN ISO 17776:2016 | Petroleum and natural gas industries. Offshore production installations. Major Accident hazard management during the design of new installations |
BS IEC 61882:2001 | Hazard and operability studies (HAZOP studies). Application guide |
BS 5760-5:1991 | Reliability of systems, equipment and components Guide to failure modes, effects and criticality analysis (FMEA and FMECA) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.