EI MODEL CODE SAFE PRACTICE PT17 VOL.3 : 1ED 2009
Current
The latest, up-to-date edition.
MODEL CODE OF SAFE PRACTICE IN THE PETROLEUM INDUSTRY - PART 17: VOLUME 3: HIGH PRESSURE AND HIGH TEMPERATURE WELL COMPLETIONS AND INTERVENTIONS
01-04-2009
Acknowledgements
Foreword
1 Introduction
2 Working practices
3 Design and equipment
4 Fluids and fluid chemistry
5 Materials
6 Perforating
7 Sand control
8 Well testing
9 QAQC
10 Abandonment
11 Workovers
12 Wireline
13 Coiled tubing
14 Hydraulic workover
15 Training and competency
Annex A - Recommended practices, specifications and standards
Annex B - Common completion and intervention risks
Annex C - Glossary of terms and abbreviations
Specifies guidance on safe practice for those planning and managing completion and intervention operations in HPHT wells.
DevelopmentNote |
Also available as a SET along with VOL 1 & VOL 2. (06/2009)
|
DocumentType |
Standard
|
PublisherName |
Energy Institute (formerly Institute of Petroleum - IP)
|
Status |
Current
|
BS EN ISO 17776:2016 | Petroleum and natural gas industries. Offshore production installations. Major Accident hazard management during the design of new installations |
BS IEC 61882:2001 | Hazard and operability studies (HAZOP studies). Application guide |
BS 5760-5:1991 | Reliability of systems, equipment and components Guide to failure modes, effects and criticality analysis (FMEA and FMECA) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.