EIA 4899 : 2001
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
STANDARD FOR PREPARING AN ELECTRONIC COMPONENTS MANAGEMENT PLAN
Hardcopy , PDF
English
01-01-2001
01-11-2007
NOTICE
Purpose
1 Scope
2 Normative References
3 Informative References
4 Terms and Definitions
5 Technical Requirements
5.1 Component Selection
5.2 Component Application
5.3 Qualification Requirements
5.4 Component Quality Assurance
5.5 Component Dependability Management
5.6 Component Compatibility with the Equipment
Manufacturing Process
5.7 Component Data
5.8 Configuration Control
6 Plan Administration Requirements
6.1 Using Components Outside the Manufacturer's
Specified Temperature Range
6.2 Plan Organization
6.3 Plan Terms and Definitions
6.4 Plan Focal Point
6.5 Plan References
6.6 Plan Applicability
6.7 Plan Implementation
6.8 Plan Acceptance
Specifies the requirements for developing an Electronic Components Management Plan (ECMP), to assure customers and regulatory agencies that all of the electronic components in the equipment of the Plan owner are selected and applied in controlled processes; and that the Technical Requirements detailed in clause 5.0 are accomplished.
| DocumentType |
Standard
|
| Pages |
32
|
| PublisherName |
Government Electronics & Information Technology Association
|
| Status |
Superseded
|
| SupersededBy |