CECC Specification systems for LF connectors
1 Scope
2 General
2.1 Related documents
2.2 Terminology
2.3 Classification into climatic categories
2.4 Creepage and clearance distances
2.5 Current
2.6 Marking
2.7 Type designation
3 General requirements, test and test schedules
3.1 Workmanship
3.2 Testing
3.3 Test schedules
4 Preparation of Detail Specifications (DS)
4.1 Titles of Detail Specification
4.2 Drawing information
4.3 System of lettering
4.4 Contents of Detail Specification
5 Quality assessment procedures
5.1 Primary stage of manufacture
5.2 Structurally similar components
5.3 System of levels
5.4 Grouping of tests
5.5 Component approval procedure
5.6 Maintenance of approval
5.7 Withdrawal or suspension of qualification
approval
5.8 Significant changes
5.9 Quality conformance inspection
5.10 Test records
5.11 Delivery of tested connectors
5.12 Release for deliveries before the completion of
Group B tests
5.13 Delayed delivery
5.14 In-process testing
6 Preparation of Detail Specifications
Annexes
A Common lettering system to be used on drawings
B Additional requirements applying to IEC 512 tests
C Additional Component Approval Procedures