EN 3275:2002
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Aerospace series - Pipe coupling 8°30' up to 28 000 kPa - Dynamic beam seal - Metric series - Technical specification
17-04-2002
01-05-2019
Foreword
1 Scope
2 Normative references
3 Symbols
4 Terms and definitions
5 Requirements, inspection and test methods
6 Quality assurance
7 Preparation for delivery
Annex A (normative) Production batch identification
This standard specifies the required characteristics, inspection and test methods, quality assurance and procurementrequirements for metric series 8 30' dynamic beam seal pipe couplings, for temperature ranges type II and III accordingto ISO 6771 and nominal pressure up to 28 000 kPa.
| Committee |
ASD-STAN
|
| DocumentType |
Standard
|
| PublisherName |
Comite Europeen de Normalisation
|
| Status |
Superseded
|
| SupersededBy |
| Standards | Relationship |
| NF EN 3275 : 2002 | Identical |
| NEN EN 3275 : 2019 | Identical |
| I.S. EN 3275:2019&LC:2019 | Identical |
| NS EN 3275 : 1ED 2002 | Identical |
| DIN EN 3275:2018-11 (Draft) | Identical |
| DIN EN 3275:2002-09 | Identical |
| ONORM EN 3275 : 2003 | Identical |
| I.S. EN 3275:2002 | Identical |
| NEN EN 3275 : 2002 | Identical |
| BS EN 3275:2002 | Identical |
| PN EN 3275 : 2005 | Identical |
| NBN EN 3275 : 2002 | Identical |
| DS EN 3275 : 2002 | Identical |
| UNE-EN 3275:2002 | Identical |
| BS EN 4686:2014 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Equipped blind ferrules |
| BS ISO 22433:2018 | Aerospace series. Pipe coupling 8°30\'. Dynamic beam seal end for elbows, tees and crosses. Geometric configuration |
| PREN 3243 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY - FERRULE, WELDED, WITH DYNAMIC BEAM SEAL END |
| PREN 3248 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY - ADAPTERS, REDUCED PIPE END WITH LOCKING RING |
| PREN 3268 : 200P3 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY - PRESSURE PLUGS |
| PREN 4022 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - ELBOWS 90 DEGREE, BULKHEAD, WELDED |
| PREN 4193 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - TEES, REDUCED, BULKHEAD LONG |
| PREN 4194 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - TEES, REDUCED, BULKHEAD |
| PREN 4025 : 200P2 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY - ELBOWS 45 MINUTES, BULKHEAD |
| PREN 4192 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - TEES, REDUCED, BULKHEAD BRANCH |
| PREN 4185 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - TEES, BULKHEAD LONG |
| PREN 3789 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES - PROTECTIVE PLUGS WITH EXTERNAL THREADS |
| PREN 4027 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - TEES, BRANCH WITH SWIVEL NUT |
| PREN 4026 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - TEES |
| PREN 4020 : 200P2 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY - ELBOWS 90 DEGREES, WELDED END WITH THRUST WIRE NUT |
| PREN 4021 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - ELBOWS 90 DEGREE, BULKHEAD |
| PREN 4031 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - NUTS FOR WELDED UNION |
| PREN 4186 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - CROSS UNIONS |
| I.S. EN 4686:2014 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30' IN TITANIUM ALLOY - EQUIPPED BLIND FERRULES |
| BS EN 3272:2001 | Aerospace series. Pipe coupling 8°30\'. Dynamic beam seal end for ferrule, welded. Geometric configuration |
| BS EN 4233:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Unions, welded, threaded |
| BS EN 4027:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Tees branch with thrust wire nut |
| BS EN 4191:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Tees, reduced, bulkhead branch, long |
| BS EN 4189:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Tees, bulkhead branch long |
| BS EN 4187:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Elbows 90°, bulkhead, long |
| BS EN 4193:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Tees, reduced bulkhead on run long |
| 06/30150695 DC : 0 | BS EN 4022 - AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30 MINUTES IN TITANIUM ALLOY - ELBOWS 45 DEGREE, SWIVEL NUT, WELDED |
| 16/30340215 DC : 0 | BS EN 3264 - AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTE IN TITANIUM ALLOY - THRUST WIRE NUTS |
| 09/30199080 DC : DRAFT JAN 2009 | BS EN 4023 - AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30 MINUTES IN TITANIUM ALLOY - ELBOWS 45 DEGREE |
| 06/30150692 DC : 0 | BS EN 4020 - AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30 MINUTES IN TITANIUM ALLOY - ELBOWS 90 DEGREE, SWIVEL NUT, WELDED |
| PREN 3272 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES - DYNAMIC BEAM SEAL END FOR NIPPLE, WELDED - GEOMETRIC CONFIGURATION |
| PREN 3264 : 200P3 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY - THRUST WIRE NUTS |
| PREN 3273 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES - DYNAMIC BEAM SEAL END FOR ELBOWS, TEES AND CROSSES - GEOMETRIC CONFIGURATION |
| PREN 4233 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY - UNIONS, WELDED, THREADED |
| PREN 4029 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - TEES BULKHEAD BRANCH |
| PREN 4028 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - TEES, SWIVEL NUT ON RUN |
| I.S. EN 3244:2002 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30 MINUTES IN TITANIUM ALLOY - UNIONS, DOUBLE ENDED |
| BS EN 4019:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Elbows 90°, welded |
| BS EN 4610:2005 | Aerospace series. Pipe coupling with 8° 30\' in titanium alloy. Elbows 45°, with thrust wire nut |
| BS EN 4021:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Elbows 90°, bulkhead |
| BS EN 4188:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Elbows 90° bulkhead, long, welded end |
| BS EN 4192:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Tees, reduced bulkhead branch |
| I.S. EN 4025:2010 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30 MINUTES IN TITANIUM ALLOY - ELBOWS 45 DEGREE, BULKHEAD |
| I.S. EN 4018:2009 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY - ELBOWS 90 DEGREES WITH THRUST WIRE NUT |
| I.S. EN 3264:2010 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTE IN TITANIUM ALLOY - THRUST WIRE NUTS |
| I.S. EN 4020:2009 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30 MINUTES IN TITANIUM ALLOY - ELBOWS 90 DEGREE, WELDED END WITH THRUST WIRE NUT |
| I.S. EN 4024:2009 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30 MINUTES IN TITANIUM ALLOY - ELBOWS 45 DEGREE WELDED END WITH THRUST WIRE NUT |
| I.S. EN 4023:2010 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30 MINUTES IN TITANIUM ALLOY - ELBOWS 45 DEGREE |
| I.S. EN 3268:2014 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30 MINUTES IN TITANIUM ALLOY - PRESSURE PLUGS |
| ISO 22433:2018 | Aerospace series — Pipe coupling 8°30' — Dynamic beam seal end for elbows, tees and crosses — Geometric configuration |
| BS ISO 22431:2018 | Aerospace series. Pipe coupling 8°30. Dynamic beam seal end for ferrule, welded. Geometric configuration |
| 09/30201403 DC : 0 | BS EN 3268 - AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY - PRESSURE PLUGS |
| 09/30199116 DC : DRAFT JAN 2009 | BS EN 4184 - AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY - ELBOWS 45 DEGREE, WELDED ENDS, DOUBLE |
| PREN 3270 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY - BLANKING PLUGS WITH LOCKING RING |
| PREN 3561 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30 MINUTES IN TITANIUM ALLOY - FERRULES WITH DYNAMIC BEAM SEAL END, WELDED AND REDUCED AT PIPE END |
| BS EN 4017:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Elbows 90° |
| BS EN 4190:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Tees, reduced with thrust wire nut on run |
| BS EN 3273:2001 | Aerospace series. Pipe coupling 8°30\'. Dynamic beam seal end for elbows, tees and crosses. Geometric configuration |
| BS EN 3084:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Unions, welded end threaded for repair |
| EN 4025:2010 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Elbows 45°, bulkhead |
| BS ISO 22437:2018 | Aerospace series. Pipe coupling 8°30 in titanium alloy. Nut for welded ferrule |
| 09/30199092 DC : DRAFT JAN 2009 | BS EN 4025 - AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY - ELBOWS 45 DEGREES, BULKHEAD |
| 08/30195582 DC : 0 | BS EN 3264 - AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY -THRUST WIRE NUTS |
| ISO 22431:2018 | Aerospace series — Pipe coupling 8°30' — Dynamic beam seal end for ferrule, welded — Geometric configuration |
| 06/30150689 DC : 0 | BS EN 4018 - AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30 MINUTES IN TITANIUM ALLOY - ELBOWS 90 DEGREE, SWIVEL NUT |
| BS EN 3244:2001 | Aerospace Series. Pipe coupling 8°30\' in titanium alloy. Unions, double ended |
| 09/30201406 DC : 0 | BS EN 4686 - AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY - EQUIPPED BLIND FERRULES |
| PREN 3788 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES - PROTECTIVE CAPS |
| PREN 4188 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - ELBOWS 90 DEGREE, BULKHEAD, LONG, WELDED |
| PREN 4686 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY - EQUIPPED BLIND FERRULES |
| PREN 4018 : 200P2 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY - ELBOWS 90 DEGREES WITH THRUST WIRE NUT |
| PREN 4183 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - ELBOWS 90 DEGREE, DOUBLE, WELDED |
| PREN 4191 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - TEES, REDUCED, BULKHEAD BRANCH, LONG |
| PREN 4187 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - ELBOWS 90 DEGREE, BULKHEAD, LONG |
| BS EN 3243:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Ferrule, welded, with dynamic beam seal end |
| BS EN 3080:2006 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Tees, reduced, branch with thrust wire nut |
| BS EN 4026:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Tees |
| BS EN 3082:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Unions, bulkhead welded, for repair |
| BS EN 4182:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Tees, reduced |
| BS EN 4025:2010 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Elbows 45°, bulkhead |
| BS EN 4020:2009 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Elbows 90°, welded end with thrust wire nut |
| BS EN 4183:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Elbows 90° welded ends |
| BS EN 4024:2009 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Elbows 45° welded end with thrust wire nut |
| BS EN 4022:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Elbows 90°, bulkhead, welded end |
| BS EN 3690:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Unions, bulkhead, long |
| BS EN 3264:2010 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Thrust wire nuts |
| BS EN 4023:2010 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Elbows 45° |
| BS EN 4185:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Tees, bulkhead on run long |
| BS EN 4186:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Unions, cross |
| BS EN 4194:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Tees, reduced, bulkhead |
| BS EN 3246:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Unions, bulkhead |
| BS EN 4030:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Tees bulkhead on run |
| BS EN 3245:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Unions, reducer |
| BS EN 4031:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Nut for welded union |
| BS EN 4018:2009 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Elbows 90° with thrust wire nut |
| BS EN 3083:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Unions, bulkhead, long welded end, for repair |
| BS EN 3268:2014 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Pressure plugs |
| BS EN 3247:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Unions, bulkhead welded end |
| EN 4019:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Elbows 90° welded end |
| EN 4610:2005 | Aerospace series - Pipe coupling 8° 30' in titanium alloy - Elbows 45°, with thrust wire nut |
| EN 4194:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Tees, reduced, bulkhead |
| EN 4182:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Tees, reduced |
| EN 3246:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Unions, straight, bulkhead |
| EN 4189:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Tees, bulkhead branch long |
| EN 3264:2010 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Thrust wire nuts |
| EN 4185:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Tees bulkhead on run long |
| EN 3243:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Ferrules, welded, with dynamic beam seal end |
| EN 4233:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Unions, welded end, threaded |
| EN 4188:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Elbows 90° bulkhead, long, welded end |
| EN 4024:2009 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Elbows 45° welded end with thrust wire nut |
| EN 3244:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Unions, straight |
| EN 4187:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Elbows 90° bulkhead, long |
| EN 4028:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Tees with thrust wire nut on run |
| EN 4030:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Tees bulkhead on run |
| EN 4017:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Elbows 90° |
| EN 3272:2001 | Aerospace series - Pipe coupling 8°30' - Dynamic beam seal end for ferrule, welded - Geometric configuration |
| EN 3268:2014 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Pressure plugs |
| EN 4193:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Tees, reduced bulkhead on run long |
| EN 4023:2010 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Elbows 45° |
| EN 4021:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Elbows 90°, bulkhead |
| EN 4191:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Tees, reduced, bulkhead branch, long |
| EN 3269:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Ferrules, blind, with dynamic beam seal end |
| EN 4026:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Tees |
| EN 4190:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Tees, reduced with thrust wire nut on run |
| EN 3245:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Unions, straight, reducer |
| EN 3247:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Unions, bulkhead, welded end |
| EN 3081:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Ferrules, welded with dynamic beam seal end, for repair |
| EN 3080:2006 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Tees, reduced, branch with thrust wire nut |
| EN 4029:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Tees bulkhead branch |
| EN 3273:2001 | Aerospace series - Pipe coupling 8°30' - Dynamic beam seal end for elbows, tees and crosses - Geometric configuration |
| EN 4184:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Elbows 45° double, welded ends |
| EN 4022:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Elbows 90° bulkhead, welded end |
| EN 4183:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Elbows 90° welded ends |
| EN 4186:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Unions, cross |
| EN 4027:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Tees branch with thrust wire nut |
| EN 4192:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Tees, reduced bulkhead branch |
| EN 4031:2001 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Nut for welded ferrule |
| EN 4020:2009 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Elbows 90°, welded end with thrust wire nut |
| EN 4018:2009 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Elbows 90° with thrust wire nut |
| EN 4686:2014 | Aerospace series - Pipe coupling 8°30' in titanium alloy - Equipped blind ferrules |
| 17/30356290 DC : 0 | BS ISO 22437 - AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY - NUT FOR WELDED FERRULE |
| PREN 4610 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY ELBOW 45 DEGREES, WITH THRUST WIRE NUT |
| PREN 4184 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - ELBOWS 45 DEGREE, DOUBLE, WELDED |
| PREN 4182 : 200P1 | PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - TEE, REDUCED |
| PREN 4030 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - TEES, BULKHEAD RUN |
| PREN 4190 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - TEES, REDUCED, WITH SWIVEL NUT ON RUN |
| PREN 4019 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - ELBOWS 90 DEGREE, WELDED |
| PREN 4017 : 200P1 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - ELBOWS 90 DEGREE |
| PREN 4023 : 200P2 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY - ELBOWS 45 DEGREES |
| PREN 4024 : 200P2 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30' IN TITANIUM ALLOY - ELBOWS 45 DEGREE WELDED END WITH THRUST WIRE NUT |
| ISO 22437:2018 | Aerospace series — Pipe coupling 8°30' in titanium alloy — Nut for welded ferrule |
| DIN EN 4233:2002-08 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30 MINUTES IN TITANIUM ALLOY - UNIONS, WELDED, THREADED |
| BS EN 3691:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Unions, bulkhead, long welded |
| BS EN 3269:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Ferrules, blind, with dynamic beam seal end |
| BS EN 4184:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Elbows 45° double, welded ends |
| BS EN 3081:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Ferrules welded, with dynamic beam seal end, for repair |
| BS EN 3561:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Ferrules with dynamic beam seal end, welded and reduced at pipe end |
| BS EN 4029:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Tees bulkhead branch |
| BS EN 4028:2001 | Aerospace series. Pipe coupling 8°30\' in titanium alloy. Tees with thrust wire nut on run |
| I.S. EN 3561:2002 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY - FERRULES WITH DYNAMIC BEAM SEAL END, WELDED AND REDUCED AT PIPE END |
| I.S. EN 3084:2001 | AEROSPACE SERIES - PIPE COUPLING IN TITANIUM ALLOY - UNIONS, WELDED AND THREADED FOR REPAIR |
| I.S. EN 3082:2001 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREE 30 MINUTES IN TITANIUM ALLOY - UNIONS, BULKHEAD WELDED END, FOR REPAIR |
| NF EN 3264 : 2011 | AEROSPACE SERIES - PIPE COUPLING 8 DEGREES 30 MINUTES IN TITANIUM ALLOY - THRUST WIRE NUTS |
| PREN 3120 : 200P3 | AEROSPACE SERIES - TITANIUM ALLOY TI-P64003 - COLD WORKED AND STRESS RELIEVED - SEAMLESS TUBE FOR PRESSURE SYSTEMS - 4 MM <= D <= 51 MM - 690 MPA <= R[M] <= 1030 MPA |
| PREN 2813 : 200P2 | AEROSPACE SERIES - ALUMINIUM ALLOY AL-P6061-T6 - DRAWN TUBE FOR PRESSURE APPLICATIONS - 0,6 MM <= A <= 12,5 MM |
| ISO 2685:1998 | Aircraft — Environmental test procedure for airborne equipment — Resistance to fire in designated fire zones |
| ISO 6771:2007 | Aerospace — Fluid systems and components — Pressure and temperature classifications |
| ISO 6772:2012 | Aerospace — Fluid systems — Impulse testing of hydraulic hose, tubing and fitting assemblies |
| ISO 8625-1:1993 | Aerospace — Fluid systems — Vocabulary — Part 1: General terms and definitions related to pressure |
| EN 3042 : 1991 | AEROSPACE SERIES - QUALITY ASSURANCE - EN AEROSPACE PRODUCTS - QUALIFICATION PROCEDURE |
| ISO 468:1982 | Surface roughness — Parameters, their values and general rules for specifying requirements |
| EN 10204:2004 | Metallic products - Types of inspection documents |
| ISO 7257:2016 | Aircraft — Hydraulic tubing joints and fittings — Rotary flexure test |
| TR 2674 : 1 | AEROSPACE SERIES - DESIGN AND CONSTRUCTION OF PIPELINES FOR FLUIDS IN LIQUID OR GASEOUS CONDITION - RIGID LINES, INSTALLATION |
| ISO 7137:1995 | Aircraft — Environmental conditions and test procedures for airborne equipment |
| ISO 9538:2017 | Aerospace series — Hydraulic tubing joints and fittings — Planar flexure test |
| MIL H 5606 : G | HYDRAULIC FLUID, PETROLEUM BASE; AIRCRAFT; MISSILE AND ORDNANCE |
| MIL H 8446 : LATEST | HYDRAULIC FLUID, NONPETROLEUM BASE, AIRCRAFT |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.