EN 50131-5-3:2017
Current
The latest, up-to-date edition.
Alarm systems - Intrusion systems - Part 5-3: Requirements for interconnections equipment using radio frequency techniques
17-03-2017
European foreword
1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
4 Requirements
5 Tests
Annex A (normative) - Test setup
Annex B (informative) - Interference signal
Annex C (informative) - Example for the
calculation of occupation rate
This European Standard applies to intrusion alarm equipment using radio frequency (RF) links and located on protected premises. It does not cover long-range radio transmissions.This European Standard defines the terms used in the field of intrusion alarm equipment using radio frequency links as well as the requirements relevant to the equipment.
| Committee |
CLC/TC 79
|
| DevelopmentNote |
Supersedes PREN 50131-5-3. (03/2017)
|
| DocumentType |
Standard
|
| PublisherName |
European Committee for Standards - Electrical
|
| Status |
Current
|
| Supersedes |
| Standards | Relationship |
| NF EN 50131-5-3 : 2005 AMD 1 2008 | Identical |
| I.S. EN 50131-5-3:2017 | Identical |
| PN EN 50131-5-3 : 2017 | Identical |
| VDE 0830-2-5-3 : 2017 | Identical |
| NBN EN 50131-5-3 : 2005 AMD 2 2010 | Identical |
| BS EN 50131-5-3:2017 | Identical |
| DIN EN 50131-5-3 : 2017 | Identical |
| NEN EN 50131-5-3 : 2017 | Identical |
| CEI EN 50131-5-3:2017 | Identical |
| UNE-EN 50131-5-3:2017 | Identical |
| BS EN 50131-8:2009 | Alarm systems. Intrusion and hold-up systems Security fog device/systems |
| BS EN 50491-6-1:2014 | General requirements for Home and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) HBES installations. Installation and planning |
| EN 50131-8:2009 | Alarm systems - Intrusion and hold-up systems - Part 8: Security fog device/systems |
| S.R. CLC/TS 50131-12:2016 | ALARM SYSTEMS - INTRUSION AND HOLD-UP SYSTEMS - PART 12: METHODS AND REQUIREMENTS FOR SETTING AND UNSETTING OF INTRUDER ALARM SYSTEMS (IAS) |
| BS EN 50131-3:2009 | Alarm systems. Intrusion and hold-up systems Control and indicating equipment |
| I.S. EN 50131-8:2009 | ALARM SYSTEMS - INTRUSION AND HOLD-UP SYSTEMS - PART 8: SECURITY FOG DEVICE/SYSTEMS |
| 17/30350085 DC : DRAFT SEP 2017 | BS EN 50131-8 - ALARM SYSTEMS - INTRUSION AND HOLD-UP SYSTEMS - PART 8: SECURITY FOG DEVICES |
| PD CLC/TR 50531:2009 | Alarm systems. Terms and definitions |
| I.S. EN 50491-6-1:2014 | GENERAL REQUIREMENTS FOR HOME AND BUILDING ELECTRONIC SYSTEMS (HBES) AND BUILDING AUTOMATION AND CONTROL SYSTEMS (BACS) - PART 6-1: HBES INSTALLATIONS - INSTALLATION AND PLANNING |
| S.R. CLC/TR 50531:2009 | ALARM SYSTEMS - TERMS AND DEFINITIONS |
| I.S. EN 50131-3:2009 | ALARM SYSTEMS - INTRUSION AND HOLD-UP SYSTEMS - PART 3: CONTROL AND INDICATING EQUIPMENT |
| CLC/TR 50531:2009 | Alarm systems - Terms and definitions |
| PREN 50131-8 : DRAFT 2017 | ALARM SYSTEMS - INTRUSION AND HOLD-UP SYSTEMS - PART 8: SECURITY FOG DEVICES |
| 12/30248102 DC : 0 | BS EN 14604 - SMOKE ALARM DEVICES |
| CEI EN 50131-3 : 2009 | ALARM SYSTEMS - INTRUSION AND HOLD-UP SYSTEMS - PART 3: CONTROL AND INDICATING EQUIPMENT |
| CEI EN 50131-8 : 2010 | ALARM SYSTEMS - INTRUSION AND HOLD-UP SYSTEMS - PART 8: SECURITY FOG DEVICE/SYSTEMS |
| EN 50491-6-1:2014 | General requirements for Home and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) - Part 6-1: HBES installations - Installation and planning |
| EN 50131-3:2009 | Alarm systems - Intrusion and hold-up systems - Part 3: Control and indicating equipment |
| EN 50131-3:2009 | Alarm systems - Intrusion and hold-up systems - Part 3: Control and indicating equipment |
| EN 50131-1:2006/A2:2017 | ALARM SYSTEMS - INTRUSION AND HOLD-UP SYSTEMS - PART 1: SYSTEM REQUIREMENTS |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.