• Shopping Cart
    There are no items in your cart

EN 50342-1:2015/A2:2021

Current

Current

The latest, up-to-date edition.

Lead-acid starter batteries - Part 1: General requirements and methods of test

Amendment of

EN 50342-1:2015

Published date

08-10-2021

Sorry this product is not available in your region.

TC21X working group 3 has been agree to implement following changes to EN 50342-1:2015/1:2018- Deletion of high current discharge after water consumption test. This is not needed as a dedicated corrosion test is available in the document.- Limitation of the maximum discharge time in cranking performance test. Batteries with high power capability might be damaged if discharge until the cut off voltage of 6,0 V is reached. To prevent this the maximum discharge time of the second step of the cranking performance test has been limited to 180 s.

Committee
CLC/TC 21X
DocumentType
Amendment
PublisherName
European Committee for Standards - Electrical
Status
Current

Standards Relationship
BS EN 50342-1:2015+A2:2021 Identical

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.